Edition: Oct 6, 2026 · Metadata only — market data is not displayed on this site

Independent · Not investment advice

Regulatory status

Regulatory status

For each contract, regulatory status, listing and launch, and trading evidence are recorded as three separate facts. NYMEX’s two contracts are awaiting CFTC approval with launch TBD. For ICE Futures U.S.’s two contracts, specifications are published but regulatory status was not established in the sources checked.

Edition of Oct 6, 2026 · updated Oct 6, 2026 at 12:04 am EDT · Fact checks are dated to the UTC day · Market data is not displayed

Four contracts

Status by contract

Compare CME vs ICE →

Each column is its own fact with its own evidence. Published specifications do not establish approval, and an exchange calendar date does not establish a launch or a trade.

Regulatory status, listing and launch, and trading evidence for the four tracked contracts
Contract · legal exchange Regulatory status Listing & launch Trading evidence
GPU1 Silicon Data H100 Rental Index Futures New York Mercantile Exchange · CME Group
Approval pending

CFTC: “Approval Pending (90)”

Record dated Sep 21, 2026 · extended review ends Nov 9, 2026

Verified Oct 5 · S1 · S4
Launch date TBD

Revised CME advisory lists the launch date as TBD

The original Oct 5, 2026 date is superseded; the revision date is unconfirmed.

Verified Oct 5 · S3 · S8 · S19
Not confirmed

No production trade verified

An evidence assessment, not a statement that no trading occurred.

Site classification · verified Oct 5 · S1 · S3
GPU2 Silicon Data B200 Rental Index Futures New York Mercantile Exchange · CME Group
Approval pending

CFTC: “Approval Pending (90)”

Record dated Sep 21, 2026 · extended review ends Nov 9, 2026

Verified Oct 5 · S2 · S4
Launch date TBD

Revised CME advisory lists the launch date as TBD

The original Oct 5, 2026 date is superseded; the revision date is unconfirmed.

Verified Oct 5 · S3 · S8 · S19
Not confirmed

No production trade verified

An evidence assessment, not a statement that no trading occurred.

Site classification · verified Oct 5 · S2 · S3
HPR Ornn Compute Price Index (OCPI) H100 Future ICE Futures U.S. · Intercontinental Exchange
Not confirmed

Current product-level regulatory status was not established in the sources checked.

Not an exhaustive filing search: only the first page of the exchange’s filing and notice lists was reviewed.

Why not confirmed
Specs published

Specifications published · No listing date set in ICE’s Sep 29, 2026 notice

Calendar FTD: Oct 5, 2026. Production launch not confirmed. Reference data with hypothetical settlement prices from Oct 5, 2026 (per ICE’s Sep 29, 2026 notice) — not trades; not shown here.

Site classification · verified Oct 5 · S6 · S10 · S12 · S14 · S20
Not confirmed

No production trade verified

An evidence assessment, not a statement that no trading occurred.

Site classification · verified Oct 5 · S6 · S14 · S20
BKL Ornn Compute Price Index (OCPI) B200 Future ICE Futures U.S. · Intercontinental Exchange
Not confirmed

Current product-level regulatory status was not established in the sources checked.

Not an exhaustive filing search: only the first page of the exchange’s filing and notice lists was reviewed.

Why not confirmed
Specs published

Specifications published · No listing date set in ICE’s Sep 29, 2026 notice

Calendar FTD: Oct 5, 2026. Production launch not confirmed. Reference data with hypothetical settlement prices from Oct 5, 2026 (per ICE’s Sep 29, 2026 notice) — not trades; not shown here.

Site classification · verified Oct 5 · S7 · S10 · S13 · S15 · S20
Not confirmed

No production trade verified

An evidence assessment, not a statement that no trading occurred.

Site classification · verified Oct 5 · S7 · S15 · S20

Why the ICE status reads “Not confirmed”

ICE Futures U.S. publishes regulation and notice pages with dynamic lists — S17 (rule-filing list) and S18 (notice list). Only the first page of the exchange’s rule-filing and notice lists was reviewed (as shown on Oct 5, 2026), so this is a bounded review: ICE’s regulatory status is unknown in this edition, not negative. What each list showed is recorded in its source limitation.

Contract-scoped event

CFTC review extension for GPU1 and GPU2

Letter dated
Sep 21, 2026
Extension
45 days
Review ends
Nov 9, 2026 · upcoming at snapshot
Applies to
GPU1, GPU2 only

The CFTC extended its review of NYMEX’s approval applications for GPU1 and GPU2. The letter sets a later end date for the review; it records no outcome. Reaching Nov 9, 2026 does not approve, reject or launch either contract — the status changes only when a new primary record says so.

The CFTC letter (S4) supports all three dates here. HPR and BKL are not part of this event.

Verified Oct 5 · S4

Category-scoped event

CFTC request for comment on compute derivatives

Comment deadline
Oct 20, 2026 · upcoming at snapshot
Scope
Compute derivatives — category-wide; no contract is targeted
Governing source
S5 · CFTC Innovation tracker

This is a consultation about compute derivatives as a category. It is not an approval decision, and no contract is attached to it in this dataset — it is not a deadline for GPU1, GPU2, HPR or BKL.

The deadline rests on S5. S4 (CFTC NYMEX review-extension letter) corroborates it: its footnote 3 cites the same request for comment and closing date. S5 remains the governing source, and S4 still governs the review-extension event above. A date-only deadline gives no closing hour.

Verified Oct 5 · S4 · S5

Dates and unknowns

Reading the dates

How dates work →

Dated milestones

Each recorded date in its lane, labelled with what kind of record it is. The text below the image lists every date with its link and evidence.

Timeline in three lanes (NYMEX, ICE Futures U.S., CFTC) of the recorded dates Aug 11, 2026, Sep 21, 2026, Sep 29, 2026, Oct 5, 2026, Oct 20, 2026 and Nov 9, 2026, each labelled as a filing, review record, exchange notice, calendar field, superseded date or deadline, with the edition date marked and a separate area for states with no date.
Only dates recorded in the Oct 6, 2026 edition, each with its kind. Rows are in date order, not to scale; no date here is an approval, launch or trade, and “upcoming” is relative to the edition date. Generated from the Oct 6, 2026 edition data. Facts shown were checked Oct 5, 2026 (UTC day). Open the full-size image (PNG).
Text of the image, with evidence

Dated compute futures milestones — Recorded dates by exchange and regulator; rows in date order, not to scale

Lanes

  • New York Mercantile Exchange (NYMEX): GPU1 and GPU2

  • ICE Futures U.S.: HPR and BKL

  • CFTC: Compute derivatives (category-wide)

Aug 11, 2026

Sep 29, 2026

Oct 5, 2026

Oct 20, 2026 (upcoming at the edition date)

Nov 9, 2026 (upcoming at the edition date)

No date recorded

  • NYMEX · GPU1 and GPU2 · Launch date: Launch date TBD GPU1 GPU2

  • NYMEX · GPU1 and GPU2 · Trading evidence: Not confirmed GPU1 GPU2

  • ICE Futures U.S. · HPR and BKL · Regulatory status: Not confirmed HPR BKL

  • ICE Futures U.S. · HPR and BKL · Launch date: Launch date TBD HPR BKL

  • ICE Futures U.S. · HPR and BKL · Trading evidence: Not confirmed HPR BKL

  • Edition date Oct 6, 2026: later dates were upcoming at the edition date

A past date is not a current status. Deadlines and calendar fields are not approvals, launches or trades. · computefuturesdata.com

“Upcoming” is relative to the edition date, Oct 6, 2026, not to today’s date. Deadlines are calendar dates as published; no closing hour is implied.

Evidence for this page

Each block lists the facts behind one displayed value and every source reference recorded for them. “Source-level locator” means no fact-specific position was recorded in this snapshot. How to read evidence

Evidence · GPU1 regulatory status

Regulatory status

Verified Oct 5, 2026

Approval pending

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Sep 21, 2026

CFTC wording

Verified Oct 5, 2026

Approval Pending (90)

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Sep 21, 2026

Record date

Verified Oct 5, 2026

Sep 21, 2026

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Sep 21, 2026

Review end date

Verified Oct 5, 2026

Nov 9, 2026 — a deadline, not an approval

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Sep 21, 2026
  • S4 CFTC NYMEX review-extension letter

    Supports this fact

    Publisher
    CFTC
    Locator
    PDF p. 1, concluding paragraph
    Upstream relation
    supports
    Source checked (UTC day)
    Oct 5, 2026
    Source document date
    Sep 21, 2026

    Limitation
    Deadline is not an approval decision or launch date. Footnote 3 cites the CFTC request for comment (91 FR 54259, August 21, 2026), comment period closing October 20, 2026; that Federal Register document itself was not retrieved.

Evidence · GPU1 listing and launch

Launch date state

Verified Oct 5, 2026

TBD

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Not known

CME’s revised clearing advisory 26-274 lists the launch date as TBD. Its full attachment was not retrieved, so the revision’s publication date is unconfirmed.

Current launch date

Verified Oct 5, 2026

TBD — no date is filled in

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Not known

CME’s revised clearing advisory 26-274 lists the launch date as TBD. Its full attachment was not retrieved, so the revision’s publication date is unconfirmed.

Original announced trade date (historical)

Verified Oct 5, 2026

Oct 5, 2026 — superseded, historical only

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Aug 11, 2026

Listing status (site classification)

Site classification · verified Oct 5, 2026

Postponed — derived from the TBD notice; shown as “Launch date TBD”

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Not known

Evidence · GPU1 trading evidence

Trading evidence (site assessment)

Site classification · verified Oct 5, 2026

Not confirmed. This describes the evidence assessment; it does not claim that no trading occurred.

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Not known

No production trade has been verified for any of the four contracts in this edition. Announced dates and calendar fields are not treated as trades, and no volume or open interest is shown. ICE says reference data including hypothetical daily settlement prices is available from Oct 5, 2026 for system development; those values are not trades or production settlements and are not shown. This is an evidence assessment, not a statement that no trading occurred.

First production trade

Not confirmed

Not confirmed

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
No verification date
Effective
Not known

No production trade has been verified for any of the four contracts in this edition. Announced dates and calendar fields are not treated as trades, and no volume or open interest is shown. ICE says reference data including hypothetical daily settlement prices is available from Oct 5, 2026 for system development; those values are not trades or production settlements and are not shown. This is an evidence assessment, not a statement that no trading occurred.

Evidence · GPU2 regulatory status

Regulatory status

Verified Oct 5, 2026

Approval pending

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Sep 21, 2026

CFTC wording

Verified Oct 5, 2026

Approval Pending (90)

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Sep 21, 2026

Record date

Verified Oct 5, 2026

Sep 21, 2026

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Sep 21, 2026

Review end date

Verified Oct 5, 2026

Nov 9, 2026 — a deadline, not an approval

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Sep 21, 2026
  • S4 CFTC NYMEX review-extension letter

    Supports this fact

    Publisher
    CFTC
    Locator
    PDF p. 1, concluding paragraph
    Upstream relation
    supports
    Source checked (UTC day)
    Oct 5, 2026
    Source document date
    Sep 21, 2026

    Limitation
    Deadline is not an approval decision or launch date. Footnote 3 cites the CFTC request for comment (91 FR 54259, August 21, 2026), comment period closing October 20, 2026; that Federal Register document itself was not retrieved.

Evidence · GPU2 listing and launch

Launch date state

Verified Oct 5, 2026

TBD

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Not known

CME’s revised clearing advisory 26-274 lists the launch date as TBD. Its full attachment was not retrieved, so the revision’s publication date is unconfirmed.

Current launch date

Verified Oct 5, 2026

TBD — no date is filled in

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Not known

CME’s revised clearing advisory 26-274 lists the launch date as TBD. Its full attachment was not retrieved, so the revision’s publication date is unconfirmed.

Original announced trade date (historical)

Verified Oct 5, 2026

Oct 5, 2026 — superseded, historical only

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Aug 11, 2026

Listing status (site classification)

Site classification · verified Oct 5, 2026

Postponed — derived from the TBD notice; shown as “Launch date TBD”

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Not known

Evidence · GPU2 trading evidence

Trading evidence (site assessment)

Site classification · verified Oct 5, 2026

Not confirmed. This describes the evidence assessment; it does not claim that no trading occurred.

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Not known

No production trade has been verified for any of the four contracts in this edition. Announced dates and calendar fields are not treated as trades, and no volume or open interest is shown. ICE says reference data including hypothetical daily settlement prices is available from Oct 5, 2026 for system development; those values are not trades or production settlements and are not shown. This is an evidence assessment, not a statement that no trading occurred.

First production trade

Not confirmed

Not confirmed

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
No verification date
Effective
Not known

No production trade has been verified for any of the four contracts in this edition. Announced dates and calendar fields are not treated as trades, and no volume or open interest is shown. ICE says reference data including hypothetical daily settlement prices is available from Oct 5, 2026 for system development; those values are not trades or production settlements and are not shown. This is an evidence assessment, not a statement that no trading occurred.

Evidence · HPR regulatory status

Regulatory status

Not confirmed

Current product-level regulatory status was not established in the sources checked. ICE Futures U.S.’s Sep 29, 2026 notice (S20) says listing awaits completion of the CFTC’s request-for-comment period; it gives no product-level CFTC status. Only the first page of the exchange’s rule-filing and notice lists was reviewed (as shown on Oct 5, 2026), so this is not an exhaustive filing search and does not show that no filing or approval exists.

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
No verification date
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:44 pm EDT, using the saved copy of S17 (retrieved Oct 5, 2026 at 5:30 pm EDT), S18 (retrieved Oct 5, 2026 at 5:30 pm EDT) and S20 (retrieved Oct 5, 2026 at 5:31 pm EDT). No new retrieval.

ICE’s current product-level regulatory status and regulatory pathway were not established in the sources checked. ICE’s Sep 29, 2026 notice says HPR and BKL will be listed pending completion of the CFTC’s request-for-comment period and that no listing date or timeline has been set; it gives no product-level CFTC status. The expiry calendar’s first trading date (FTD) is a calendar field and does not confirm a launch or a trade. Only the first page of ICE’s rule-filing and notice lists was reviewed, so the absence of a filing or approval cannot be claimed.

  • S10 ICE and Ornn product-program announcement

    Checked context — does not confirm a value

    Publisher
    ICE
    Source-level locator
    May 19 announcement: benchmark and regulatory caveatFact-specific position not recorded in this snapshot
    Upstream relation
    checked context
    Source checked (UTC day)
    Oct 5, 2026
    Source document date
    May 19, 2026

    Limitation
    Historical announcement does not establish current product-level regulatory state.

  • S17 ICE Futures U.S. Regulation

    Checked context — does not confirm a value

    Publisher
    ICE Futures U.S.
    Source-level locator
    Regulation introduction; Rulebook and Rule Filings sectionsFact-specific position not recorded in this snapshot
    Upstream relation
    checked context
    Source checked (UTC day)
    Oct 5, 2026

    Limitation
    Static HTML exposed only the Energy Forms tab. A headless-browser render (2026-10-05 21:30 UTC) showed the first page of Rule Filings (100 titles, Mar 2 – Oct 5, 2026; titles only) and the Rulebook chapter list. No title on that page mentions compute, Ornn, OCPI or GPU, and the chapter list names Chapter 34 “OKX Futures”. Later pages and generic filings were not opened, so this is not an exhaustive filing search.

  • S18 ICE Futures U.S. Notices

    Checked context — does not confirm a value

    Publisher
    ICE Futures U.S.
    Source-level locator
    Exchange Notices sectionFact-specific position not recorded in this snapshot
    Upstream relation
    checked context
    Source checked (UTC day)
    Oct 5, 2026

    Limitation
    Static HTML lacked the notice list. A headless-browser render (2026-10-05 21:30 UTC) showed page 1 of Exchange Notices (100 rows, Feb 4 – Oct 5, 2026), including one compute notice (S20). Later pages and Member and Disciplinary notices were not reviewed, so the absence of another notice cannot be claimed.

  • S20 ICE Futures U.S. Exchange Notice: compute index reference data (Sep 29, 2026)

    Checked context — does not confirm a value

    Publisher
    ICE Futures U.S.
    Locator
    PDF p. 1, paragraph 2 (listing “pending completion of the request for comment period”)Recorded position where this field was checked. It is not evidence of a value; the field remains unknown.
    Upstream relation
    checked context
    Source checked (UTC day)
    Oct 5, 2026
    Source document date
    Sep 29, 2026

    Limitation
    States the exchange’s position as of Sep 29, 2026. It sets no listing date, gives no CFTC product-level status for HPR or BKL, and does not show whether a later announcement exists. The reference data it describes, including hypothetical daily settlement prices, is not trading or production settlement and is not imported.

Regulatory pathway

Not confirmed

Not confirmed

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
No verification date
Effective
Not known

ICE’s current product-level regulatory status and regulatory pathway were not established in the sources checked. ICE’s Sep 29, 2026 notice says HPR and BKL will be listed pending completion of the CFTC’s request-for-comment period and that no listing date or timeline has been set; it gives no product-level CFTC status. The expiry calendar’s first trading date (FTD) is a calendar field and does not confirm a launch or a trade. Only the first page of ICE’s rule-filing and notice lists was reviewed, so the absence of a filing or approval cannot be claimed.

  • S10 ICE and Ornn product-program announcement

    Checked context — does not confirm a value

    Publisher
    ICE
    Source-level locator
    May 19 announcement: benchmark and regulatory caveatFact-specific position not recorded in this snapshot
    Upstream relation
    checked context
    Source checked (UTC day)
    Oct 5, 2026
    Source document date
    May 19, 2026

    Limitation
    Historical announcement does not establish current product-level regulatory state.

  • S17 ICE Futures U.S. Regulation

    Checked context — does not confirm a value

    Publisher
    ICE Futures U.S.
    Source-level locator
    Regulation introduction; Rulebook and Rule Filings sectionsFact-specific position not recorded in this snapshot
    Upstream relation
    checked context
    Source checked (UTC day)
    Oct 5, 2026

    Limitation
    Static HTML exposed only the Energy Forms tab. A headless-browser render (2026-10-05 21:30 UTC) showed the first page of Rule Filings (100 titles, Mar 2 – Oct 5, 2026; titles only) and the Rulebook chapter list. No title on that page mentions compute, Ornn, OCPI or GPU, and the chapter list names Chapter 34 “OKX Futures”. Later pages and generic filings were not opened, so this is not an exhaustive filing search.

Regulatory status date

Not confirmed

Not confirmed

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
No verification date
Effective
Not known

ICE’s current product-level regulatory status and regulatory pathway were not established in the sources checked. ICE’s Sep 29, 2026 notice says HPR and BKL will be listed pending completion of the CFTC’s request-for-comment period and that no listing date or timeline has been set; it gives no product-level CFTC status. The expiry calendar’s first trading date (FTD) is a calendar field and does not confirm a launch or a trade. Only the first page of ICE’s rule-filing and notice lists was reviewed, so the absence of a filing or approval cannot be claimed.

  • S17 ICE Futures U.S. Regulation

    Checked context — does not confirm a value

    Publisher
    ICE Futures U.S.
    Source-level locator
    Regulation introduction; Rulebook and Rule Filings sectionsFact-specific position not recorded in this snapshot
    Upstream relation
    checked context
    Source checked (UTC day)
    Oct 5, 2026

    Limitation
    Static HTML exposed only the Energy Forms tab. A headless-browser render (2026-10-05 21:30 UTC) showed the first page of Rule Filings (100 titles, Mar 2 – Oct 5, 2026; titles only) and the Rulebook chapter list. No title on that page mentions compute, Ornn, OCPI or GPU, and the chapter list names Chapter 34 “OKX Futures”. Later pages and generic filings were not opened, so this is not an exhaustive filing search.

Evidence · HPR listing and launch

Listing status (site classification)

Site classification · verified Oct 5, 2026

Specifications published. A publication classification, not a legal listing conclusion.

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Not known
  • S6 ICE HPR official product page

    Supports this fact

    Publisher
    ICE Futures U.S.
    Source-level locator
    Market Specifications headingsFact-specific position not recorded in this snapshot
    Upstream relation
    supports
    Source checked (UTC day)
    Oct 5, 2026

    Same reference family as S12 — one family, not independent confirmations.

    Limitation
    Quote denominator differs between quotation and fluctuation sections. Lower city-time table conflicts with explicit session text.

  • S12 ICE HPR generated specification PDF

    Supports this fact

    Publisher
    ICE Futures U.S.
    Source-level locator
    PDF pp. 1–2 field labelsFact-specific position not recorded in this snapshot
    Upstream relation
    supports
    Source checked (UTC day)
    Oct 5, 2026

    Same reference family as S6 — one family, not independent confirmations.

    Limitation
    PDF displayed date 2026-10-05 is not treated as a rule effective date; shares source family with S6.

Exchange listing statement

Verified Oct 5, 2026

ICE’s Sep 29, 2026 notice says the contract will be listed pending completion of the CFTC’s request-for-comment period, and that no listing date or timeline has been set. That is the exchange’s position on the notice date, not a regulatory decision.

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:39 pm EDT, using the saved copy of S20 (retrieved Oct 5, 2026 at 5:31 pm EDT). No new retrieval.

ICE’s current product-level regulatory status and regulatory pathway were not established in the sources checked. ICE’s Sep 29, 2026 notice says HPR and BKL will be listed pending completion of the CFTC’s request-for-comment period and that no listing date or timeline has been set; it gives no product-level CFTC status. The expiry calendar’s first trading date (FTD) is a calendar field and does not confirm a launch or a trade. Only the first page of ICE’s rule-filing and notice lists was reviewed, so the absence of a filing or approval cannot be claimed.

  • S20 ICE Futures U.S. Exchange Notice: compute index reference data (Sep 29, 2026)

    Supports this fact

    Publisher
    ICE Futures U.S.
    Locator
    PDF p. 1, paragraph 2 (listing “pending completion of the request for comment period”)
    Upstream relation
    supports
    Source checked (UTC day)
    Oct 5, 2026
    Source document date
    Sep 29, 2026

    Limitation
    States the exchange’s position as of Sep 29, 2026. It sets no listing date, gives no CFTC product-level status for HPR or BKL, and does not show whether a later announcement exists. The reference data it describes, including hypothetical daily settlement prices, is not trading or production settlement and is not imported.

Launch date state

Verified Oct 5, 2026

TBD — No listing date set in ICE’s Sep 29, 2026 notice

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:39 pm EDT, using the saved copy of S20 (retrieved Oct 5, 2026 at 5:31 pm EDT). No new retrieval.

ICE’s current product-level regulatory status and regulatory pathway were not established in the sources checked. ICE’s Sep 29, 2026 notice says HPR and BKL will be listed pending completion of the CFTC’s request-for-comment period and that no listing date or timeline has been set; it gives no product-level CFTC status. The expiry calendar’s first trading date (FTD) is a calendar field and does not confirm a launch or a trade. Only the first page of ICE’s rule-filing and notice lists was reviewed, so the absence of a filing or approval cannot be claimed.

Current launch date

Verified Oct 5, 2026

TBD — no date is filled in

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:39 pm EDT, using the saved copy of S20 (retrieved Oct 5, 2026 at 5:31 pm EDT). No new retrieval.

ICE’s current product-level regulatory status and regulatory pathway were not established in the sources checked. ICE’s Sep 29, 2026 notice says HPR and BKL will be listed pending completion of the CFTC’s request-for-comment period and that no listing date or timeline has been set; it gives no product-level CFTC status. The expiry calendar’s first trading date (FTD) is a calendar field and does not confirm a launch or a trade. Only the first page of ICE’s rule-filing and notice lists was reviewed, so the absence of a filing or approval cannot be claimed.

Calendar FTD (exchange calendar field)

Verified Oct 5, 2026

Oct 5, 2026. This exchange calendar field does not independently confirm production launch or an actual trade.

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Not known

Reference data (exchange statement)

Verified Oct 5, 2026

ICE’s Sep 29, 2026 notice says it makes index reference data, including hypothetical daily settlement prices, available from Oct 5, 2026 for system development. These are not trades, a launch or production settlements, and none of the values are shown on this site.

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:39 pm EDT, using the saved copy of S20 (retrieved Oct 5, 2026 at 5:31 pm EDT). No new retrieval.

No production trade has been verified for any of the four contracts in this edition. Announced dates and calendar fields are not treated as trades, and no volume or open interest is shown. ICE says reference data including hypothetical daily settlement prices is available from Oct 5, 2026 for system development; those values are not trades or production settlements and are not shown. This is an evidence assessment, not a statement that no trading occurred.

No market-data display licence is recorded for this site, so price, settlement, volume, open-interest and index-history components are off. This does not mean the market has no data.

  • S20 ICE Futures U.S. Exchange Notice: compute index reference data (Sep 29, 2026)

    Supports this fact

    Publisher
    ICE Futures U.S.
    Locator
    PDF p. 1, paragraph 3 (reference data including hypothetical daily settlement prices)
    Upstream relation
    supports
    Source checked (UTC day)
    Oct 5, 2026
    Source document date
    Sep 29, 2026

    Limitation
    States the exchange’s position as of Sep 29, 2026. It sets no listing date, gives no CFTC product-level status for HPR or BKL, and does not show whether a later announcement exists. The reference data it describes, including hypothetical daily settlement prices, is not trading or production settlement and is not imported.

Evidence · HPR trading evidence

Trading evidence (site assessment)

Site classification · verified Oct 5, 2026

Not confirmed. This describes the evidence assessment; it does not claim that no trading occurred.

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:39 pm EDT, using the saved copy of S20 (retrieved Oct 5, 2026 at 5:31 pm EDT). No new retrieval.

ICE’s current product-level regulatory status and regulatory pathway were not established in the sources checked. ICE’s Sep 29, 2026 notice says HPR and BKL will be listed pending completion of the CFTC’s request-for-comment period and that no listing date or timeline has been set; it gives no product-level CFTC status. The expiry calendar’s first trading date (FTD) is a calendar field and does not confirm a launch or a trade. Only the first page of ICE’s rule-filing and notice lists was reviewed, so the absence of a filing or approval cannot be claimed.

No production trade has been verified for any of the four contracts in this edition. Announced dates and calendar fields are not treated as trades, and no volume or open interest is shown. ICE says reference data including hypothetical daily settlement prices is available from Oct 5, 2026 for system development; those values are not trades or production settlements and are not shown. This is an evidence assessment, not a statement that no trading occurred.

  • S6 ICE HPR official product page

    Supports this fact

    Publisher
    ICE Futures U.S.
    Source-level locator
    Market Specifications headingsFact-specific position not recorded in this snapshot
    Upstream relation
    supports
    Source checked (UTC day)
    Oct 5, 2026

    Same reference family as S12 — one family, not independent confirmations.

    Limitation
    Quote denominator differs between quotation and fluctuation sections. Lower city-time table conflicts with explicit session text.

  • S14 ICE HPR expiry calendar

    Supports this fact

    Publisher
    ICE Futures U.S.
    Source-level locator
    Expiry Details table, Nov26–Dec27 rowsFact-specific position not recorded in this snapshot
    Upstream relation
    supports
    Source checked (UTC day)
    Oct 5, 2026

    Limitation
    FTD is an exchange calendar field, not evidence of an actual execution. FSD is not automatically final payment date.

  • S20 ICE Futures U.S. Exchange Notice: compute index reference data (Sep 29, 2026)

    Checked context — does not confirm a value

    Publisher
    ICE Futures U.S.
    Locator
    PDF p. 1, paragraphs 2–3 (no listing date set; reference data with hypothetical settlement prices)Recorded position where this field was checked. It is not evidence of a value; the field remains unknown.
    Upstream relation
    checked context
    Source checked (UTC day)
    Oct 5, 2026
    Source document date
    Sep 29, 2026

    Limitation
    States the exchange’s position as of Sep 29, 2026. It sets no listing date, gives no CFTC product-level status for HPR or BKL, and does not show whether a later announcement exists. The reference data it describes, including hypothetical daily settlement prices, is not trading or production settlement and is not imported.

First production trade

Not confirmed

Not confirmed

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
No verification date
Effective
Not known

No production trade has been verified for any of the four contracts in this edition. Announced dates and calendar fields are not treated as trades, and no volume or open interest is shown. ICE says reference data including hypothetical daily settlement prices is available from Oct 5, 2026 for system development; those values are not trades or production settlements and are not shown. This is an evidence assessment, not a statement that no trading occurred.

  • S14 ICE HPR expiry calendar

    Checked context — does not confirm a value

    Publisher
    ICE Futures U.S.
    Locator
    FTD calendar columnRecorded position where this field was checked. It is not evidence of a value; the field remains unknown.
    Upstream relation
    checked context
    Source checked (UTC day)
    Oct 5, 2026

    Limitation
    FTD is an exchange calendar field, not evidence of an actual execution. FSD is not automatically final payment date.

Evidence · BKL regulatory status

Regulatory status

Not confirmed

Current product-level regulatory status was not established in the sources checked. ICE Futures U.S.’s Sep 29, 2026 notice (S20) says listing awaits completion of the CFTC’s request-for-comment period; it gives no product-level CFTC status. Only the first page of the exchange’s rule-filing and notice lists was reviewed (as shown on Oct 5, 2026), so this is not an exhaustive filing search and does not show that no filing or approval exists.

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
No verification date
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:44 pm EDT, using the saved copy of S17 (retrieved Oct 5, 2026 at 5:30 pm EDT), S18 (retrieved Oct 5, 2026 at 5:30 pm EDT) and S20 (retrieved Oct 5, 2026 at 5:31 pm EDT). No new retrieval.

ICE’s current product-level regulatory status and regulatory pathway were not established in the sources checked. ICE’s Sep 29, 2026 notice says HPR and BKL will be listed pending completion of the CFTC’s request-for-comment period and that no listing date or timeline has been set; it gives no product-level CFTC status. The expiry calendar’s first trading date (FTD) is a calendar field and does not confirm a launch or a trade. Only the first page of ICE’s rule-filing and notice lists was reviewed, so the absence of a filing or approval cannot be claimed.

  • S10 ICE and Ornn product-program announcement

    Checked context — does not confirm a value

    Publisher
    ICE
    Source-level locator
    May 19 announcement: benchmark and regulatory caveatFact-specific position not recorded in this snapshot
    Upstream relation
    checked context
    Source checked (UTC day)
    Oct 5, 2026
    Source document date
    May 19, 2026

    Limitation
    Historical announcement does not establish current product-level regulatory state.

  • S17 ICE Futures U.S. Regulation

    Checked context — does not confirm a value

    Publisher
    ICE Futures U.S.
    Source-level locator
    Regulation introduction; Rulebook and Rule Filings sectionsFact-specific position not recorded in this snapshot
    Upstream relation
    checked context
    Source checked (UTC day)
    Oct 5, 2026

    Limitation
    Static HTML exposed only the Energy Forms tab. A headless-browser render (2026-10-05 21:30 UTC) showed the first page of Rule Filings (100 titles, Mar 2 – Oct 5, 2026; titles only) and the Rulebook chapter list. No title on that page mentions compute, Ornn, OCPI or GPU, and the chapter list names Chapter 34 “OKX Futures”. Later pages and generic filings were not opened, so this is not an exhaustive filing search.

  • S18 ICE Futures U.S. Notices

    Checked context — does not confirm a value

    Publisher
    ICE Futures U.S.
    Source-level locator
    Exchange Notices sectionFact-specific position not recorded in this snapshot
    Upstream relation
    checked context
    Source checked (UTC day)
    Oct 5, 2026

    Limitation
    Static HTML lacked the notice list. A headless-browser render (2026-10-05 21:30 UTC) showed page 1 of Exchange Notices (100 rows, Feb 4 – Oct 5, 2026), including one compute notice (S20). Later pages and Member and Disciplinary notices were not reviewed, so the absence of another notice cannot be claimed.

  • S20 ICE Futures U.S. Exchange Notice: compute index reference data (Sep 29, 2026)

    Checked context — does not confirm a value

    Publisher
    ICE Futures U.S.
    Locator
    PDF p. 1, paragraph 2 (listing “pending completion of the request for comment period”)Recorded position where this field was checked. It is not evidence of a value; the field remains unknown.
    Upstream relation
    checked context
    Source checked (UTC day)
    Oct 5, 2026
    Source document date
    Sep 29, 2026

    Limitation
    States the exchange’s position as of Sep 29, 2026. It sets no listing date, gives no CFTC product-level status for HPR or BKL, and does not show whether a later announcement exists. The reference data it describes, including hypothetical daily settlement prices, is not trading or production settlement and is not imported.

Regulatory pathway

Not confirmed

Not confirmed

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
No verification date
Effective
Not known

ICE’s current product-level regulatory status and regulatory pathway were not established in the sources checked. ICE’s Sep 29, 2026 notice says HPR and BKL will be listed pending completion of the CFTC’s request-for-comment period and that no listing date or timeline has been set; it gives no product-level CFTC status. The expiry calendar’s first trading date (FTD) is a calendar field and does not confirm a launch or a trade. Only the first page of ICE’s rule-filing and notice lists was reviewed, so the absence of a filing or approval cannot be claimed.

  • S10 ICE and Ornn product-program announcement

    Checked context — does not confirm a value

    Publisher
    ICE
    Source-level locator
    May 19 announcement: benchmark and regulatory caveatFact-specific position not recorded in this snapshot
    Upstream relation
    checked context
    Source checked (UTC day)
    Oct 5, 2026
    Source document date
    May 19, 2026

    Limitation
    Historical announcement does not establish current product-level regulatory state.

  • S17 ICE Futures U.S. Regulation

    Checked context — does not confirm a value

    Publisher
    ICE Futures U.S.
    Source-level locator
    Regulation introduction; Rulebook and Rule Filings sectionsFact-specific position not recorded in this snapshot
    Upstream relation
    checked context
    Source checked (UTC day)
    Oct 5, 2026

    Limitation
    Static HTML exposed only the Energy Forms tab. A headless-browser render (2026-10-05 21:30 UTC) showed the first page of Rule Filings (100 titles, Mar 2 – Oct 5, 2026; titles only) and the Rulebook chapter list. No title on that page mentions compute, Ornn, OCPI or GPU, and the chapter list names Chapter 34 “OKX Futures”. Later pages and generic filings were not opened, so this is not an exhaustive filing search.

Regulatory status date

Not confirmed

Not confirmed

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
No verification date
Effective
Not known

ICE’s current product-level regulatory status and regulatory pathway were not established in the sources checked. ICE’s Sep 29, 2026 notice says HPR and BKL will be listed pending completion of the CFTC’s request-for-comment period and that no listing date or timeline has been set; it gives no product-level CFTC status. The expiry calendar’s first trading date (FTD) is a calendar field and does not confirm a launch or a trade. Only the first page of ICE’s rule-filing and notice lists was reviewed, so the absence of a filing or approval cannot be claimed.

  • S17 ICE Futures U.S. Regulation

    Checked context — does not confirm a value

    Publisher
    ICE Futures U.S.
    Source-level locator
    Regulation introduction; Rulebook and Rule Filings sectionsFact-specific position not recorded in this snapshot
    Upstream relation
    checked context
    Source checked (UTC day)
    Oct 5, 2026

    Limitation
    Static HTML exposed only the Energy Forms tab. A headless-browser render (2026-10-05 21:30 UTC) showed the first page of Rule Filings (100 titles, Mar 2 – Oct 5, 2026; titles only) and the Rulebook chapter list. No title on that page mentions compute, Ornn, OCPI or GPU, and the chapter list names Chapter 34 “OKX Futures”. Later pages and generic filings were not opened, so this is not an exhaustive filing search.

Evidence · BKL listing and launch

Listing status (site classification)

Site classification · verified Oct 5, 2026

Specifications published. A publication classification, not a legal listing conclusion.

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Not known
  • S7 ICE BKL official product page

    Supports this fact

    Publisher
    ICE Futures U.S.
    Source-level locator
    Market Specifications headingsFact-specific position not recorded in this snapshot
    Upstream relation
    supports
    Source checked (UTC day)
    Oct 5, 2026

    Same reference family as S13 — one family, not independent confirmations.

    Limitation
    Quote denominator differs between quotation and fluctuation sections.

  • S13 ICE BKL generated specification PDF

    Supports this fact

    Publisher
    ICE Futures U.S.
    Source-level locator
    PDF pp. 1–2 field labelsFact-specific position not recorded in this snapshot
    Upstream relation
    supports
    Source checked (UTC day)
    Oct 5, 2026

    Same reference family as S7 — one family, not independent confirmations.

    Limitation
    PDF displayed date varies by generation (2026-10-04 at the original snapshot check; 2026-10-05 in the 2026-10-05 21:28 UTC retrieval). It is a generation date, not a publication or rule effective date; shares source family with S7.

Exchange listing statement

Verified Oct 5, 2026

ICE’s Sep 29, 2026 notice says the contract will be listed pending completion of the CFTC’s request-for-comment period, and that no listing date or timeline has been set. That is the exchange’s position on the notice date, not a regulatory decision.

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:39 pm EDT, using the saved copy of S20 (retrieved Oct 5, 2026 at 5:31 pm EDT). No new retrieval.

ICE’s current product-level regulatory status and regulatory pathway were not established in the sources checked. ICE’s Sep 29, 2026 notice says HPR and BKL will be listed pending completion of the CFTC’s request-for-comment period and that no listing date or timeline has been set; it gives no product-level CFTC status. The expiry calendar’s first trading date (FTD) is a calendar field and does not confirm a launch or a trade. Only the first page of ICE’s rule-filing and notice lists was reviewed, so the absence of a filing or approval cannot be claimed.

  • S20 ICE Futures U.S. Exchange Notice: compute index reference data (Sep 29, 2026)

    Supports this fact

    Publisher
    ICE Futures U.S.
    Locator
    PDF p. 1, paragraph 2 (listing “pending completion of the request for comment period”)
    Upstream relation
    supports
    Source checked (UTC day)
    Oct 5, 2026
    Source document date
    Sep 29, 2026

    Limitation
    States the exchange’s position as of Sep 29, 2026. It sets no listing date, gives no CFTC product-level status for HPR or BKL, and does not show whether a later announcement exists. The reference data it describes, including hypothetical daily settlement prices, is not trading or production settlement and is not imported.

Launch date state

Verified Oct 5, 2026

TBD — No listing date set in ICE’s Sep 29, 2026 notice

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:39 pm EDT, using the saved copy of S20 (retrieved Oct 5, 2026 at 5:31 pm EDT). No new retrieval.

ICE’s current product-level regulatory status and regulatory pathway were not established in the sources checked. ICE’s Sep 29, 2026 notice says HPR and BKL will be listed pending completion of the CFTC’s request-for-comment period and that no listing date or timeline has been set; it gives no product-level CFTC status. The expiry calendar’s first trading date (FTD) is a calendar field and does not confirm a launch or a trade. Only the first page of ICE’s rule-filing and notice lists was reviewed, so the absence of a filing or approval cannot be claimed.

Current launch date

Verified Oct 5, 2026

TBD — no date is filled in

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:39 pm EDT, using the saved copy of S20 (retrieved Oct 5, 2026 at 5:31 pm EDT). No new retrieval.

ICE’s current product-level regulatory status and regulatory pathway were not established in the sources checked. ICE’s Sep 29, 2026 notice says HPR and BKL will be listed pending completion of the CFTC’s request-for-comment period and that no listing date or timeline has been set; it gives no product-level CFTC status. The expiry calendar’s first trading date (FTD) is a calendar field and does not confirm a launch or a trade. Only the first page of ICE’s rule-filing and notice lists was reviewed, so the absence of a filing or approval cannot be claimed.

Calendar FTD (exchange calendar field)

Verified Oct 5, 2026

Oct 5, 2026. This exchange calendar field does not independently confirm production launch or an actual trade.

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Not known

Reference data (exchange statement)

Verified Oct 5, 2026

ICE’s Sep 29, 2026 notice says it makes index reference data, including hypothetical daily settlement prices, available from Oct 5, 2026 for system development. These are not trades, a launch or production settlements, and none of the values are shown on this site.

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:39 pm EDT, using the saved copy of S20 (retrieved Oct 5, 2026 at 5:31 pm EDT). No new retrieval.

No production trade has been verified for any of the four contracts in this edition. Announced dates and calendar fields are not treated as trades, and no volume or open interest is shown. ICE says reference data including hypothetical daily settlement prices is available from Oct 5, 2026 for system development; those values are not trades or production settlements and are not shown. This is an evidence assessment, not a statement that no trading occurred.

No market-data display licence is recorded for this site, so price, settlement, volume, open-interest and index-history components are off. This does not mean the market has no data.

  • S20 ICE Futures U.S. Exchange Notice: compute index reference data (Sep 29, 2026)

    Supports this fact

    Publisher
    ICE Futures U.S.
    Locator
    PDF p. 1, paragraph 3 (reference data including hypothetical daily settlement prices)
    Upstream relation
    supports
    Source checked (UTC day)
    Oct 5, 2026
    Source document date
    Sep 29, 2026

    Limitation
    States the exchange’s position as of Sep 29, 2026. It sets no listing date, gives no CFTC product-level status for HPR or BKL, and does not show whether a later announcement exists. The reference data it describes, including hypothetical daily settlement prices, is not trading or production settlement and is not imported.

Evidence · BKL trading evidence

Trading evidence (site assessment)

Site classification · verified Oct 5, 2026

Not confirmed. This describes the evidence assessment; it does not claim that no trading occurred.

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:39 pm EDT, using the saved copy of S20 (retrieved Oct 5, 2026 at 5:31 pm EDT). No new retrieval.

ICE’s current product-level regulatory status and regulatory pathway were not established in the sources checked. ICE’s Sep 29, 2026 notice says HPR and BKL will be listed pending completion of the CFTC’s request-for-comment period and that no listing date or timeline has been set; it gives no product-level CFTC status. The expiry calendar’s first trading date (FTD) is a calendar field and does not confirm a launch or a trade. Only the first page of ICE’s rule-filing and notice lists was reviewed, so the absence of a filing or approval cannot be claimed.

No production trade has been verified for any of the four contracts in this edition. Announced dates and calendar fields are not treated as trades, and no volume or open interest is shown. ICE says reference data including hypothetical daily settlement prices is available from Oct 5, 2026 for system development; those values are not trades or production settlements and are not shown. This is an evidence assessment, not a statement that no trading occurred.

  • S7 ICE BKL official product page

    Supports this fact

    Publisher
    ICE Futures U.S.
    Source-level locator
    Market Specifications headingsFact-specific position not recorded in this snapshot
    Upstream relation
    supports
    Source checked (UTC day)
    Oct 5, 2026

    Same reference family as S13 — one family, not independent confirmations.

    Limitation
    Quote denominator differs between quotation and fluctuation sections.

  • S15 ICE BKL expiry calendar

    Supports this fact

    Publisher
    ICE Futures U.S.
    Source-level locator
    Expiry Details table, Nov26–Dec27 rowsFact-specific position not recorded in this snapshot
    Upstream relation
    supports
    Source checked (UTC day)
    Oct 5, 2026

    Limitation
    Same calendar/actual-execution distinction as S14.

  • S20 ICE Futures U.S. Exchange Notice: compute index reference data (Sep 29, 2026)

    Checked context — does not confirm a value

    Publisher
    ICE Futures U.S.
    Locator
    PDF p. 1, paragraphs 2–3 (no listing date set; reference data with hypothetical settlement prices)Recorded position where this field was checked. It is not evidence of a value; the field remains unknown.
    Upstream relation
    checked context
    Source checked (UTC day)
    Oct 5, 2026
    Source document date
    Sep 29, 2026

    Limitation
    States the exchange’s position as of Sep 29, 2026. It sets no listing date, gives no CFTC product-level status for HPR or BKL, and does not show whether a later announcement exists. The reference data it describes, including hypothetical daily settlement prices, is not trading or production settlement and is not imported.

First production trade

Not confirmed

Not confirmed

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
No verification date
Effective
Not known

No production trade has been verified for any of the four contracts in this edition. Announced dates and calendar fields are not treated as trades, and no volume or open interest is shown. ICE says reference data including hypothetical daily settlement prices is available from Oct 5, 2026 for system development; those values are not trades or production settlements and are not shown. This is an evidence assessment, not a statement that no trading occurred.

Evidence · CFTC review extension (GPU1 and GPU2)

Letter date

Verified Oct 5, 2026

Sep 21, 2026

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Sep 21, 2026
  • S4 CFTC NYMEX review-extension letter

    Supports this fact

    Publisher
    CFTC
    Locator
    PDF p. 1 letter date
    Upstream relation
    supports
    Source checked (UTC day)
    Oct 5, 2026
    Source document date
    Sep 21, 2026

    Limitation
    Deadline is not an approval decision or launch date. Footnote 3 cites the CFTC request for comment (91 FR 54259, August 21, 2026), comment period closing October 20, 2026; that Federal Register document itself was not retrieved.

Extension

Verified Oct 5, 2026

45 days

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Sep 21, 2026
  • S4 CFTC NYMEX review-extension letter

    Supports this fact

    Publisher
    CFTC
    Locator
    PDF p. 1 review extension
    Upstream relation
    supports
    Source checked (UTC day)
    Oct 5, 2026
    Source document date
    Sep 21, 2026

    Limitation
    Deadline is not an approval decision or launch date. Footnote 3 cites the CFTC request for comment (91 FR 54259, August 21, 2026), comment period closing October 20, 2026; that Federal Register document itself was not retrieved.

Review end date

Verified Oct 5, 2026

Nov 9, 2026 — a deadline, not an approval or launch

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Sep 21, 2026
  • S4 CFTC NYMEX review-extension letter

    Supports this fact

    Publisher
    CFTC
    Locator
    PDF p. 1 concluding paragraph
    Upstream relation
    supports
    Source checked (UTC day)
    Oct 5, 2026
    Source document date
    Sep 21, 2026

    Limitation
    Deadline is not an approval decision or launch date. Footnote 3 cites the CFTC request for comment (91 FR 54259, August 21, 2026), comment period closing October 20, 2026; that Federal Register document itself was not retrieved.

Evidence · NYMEX 26-370 filing

GPU1 filing

Verified Oct 5, 2026

NYMEX 26-370

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Aug 11, 2026
  • S8 NYMEX Submission 26-370

    Supports this fact

    Publisher
    NYMEX, filed with CFTC
    Locator
    PDF pp. 1–2
    Upstream relation
    supports
    Source checked (UTC day)
    Oct 5, 2026
    Source document date
    Aug 11, 2026

    Limitation
    Filed terms are proposed terms while approval is pending. Initial schedule is not a verified current listing.

GPU1 filing date

Verified Oct 5, 2026

Aug 11, 2026

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Aug 11, 2026
  • S8 NYMEX Submission 26-370

    Supports this fact

    Publisher
    NYMEX, filed with CFTC
    Locator
    PDF p. 2 letter date
    Upstream relation
    supports
    Source checked (UTC day)
    Oct 5, 2026
    Source document date
    Aug 11, 2026

    Limitation
    Filed terms are proposed terms while approval is pending. Initial schedule is not a verified current listing.

GPU2 filing

Verified Oct 5, 2026

NYMEX 26-370

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Aug 11, 2026
  • S8 NYMEX Submission 26-370

    Supports this fact

    Publisher
    NYMEX, filed with CFTC
    Locator
    PDF pp. 1–2
    Upstream relation
    supports
    Source checked (UTC day)
    Oct 5, 2026
    Source document date
    Aug 11, 2026

    Limitation
    Filed terms are proposed terms while approval is pending. Initial schedule is not a verified current listing.

GPU2 filing date

Verified Oct 5, 2026

Aug 11, 2026

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Aug 11, 2026
  • S8 NYMEX Submission 26-370

    Supports this fact

    Publisher
    NYMEX, filed with CFTC
    Locator
    PDF p. 2 letter date
    Upstream relation
    supports
    Source checked (UTC day)
    Oct 5, 2026
    Source document date
    Aug 11, 2026

    Limitation
    Filed terms are proposed terms while approval is pending. Initial schedule is not a verified current listing.

Evidence · CFTC comment deadline (category-level)

Comment deadline

Verified Oct 5, 2026

Oct 20, 2026

Fact checked (UTC day)
Oct 5, 2026
Fact verified (UTC day)
Oct 5, 2026
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:45 pm EDT, using the saved copy of S4 (retrieved Oct 5, 2026 at 5:28 pm EDT) and S5 (retrieved Oct 5, 2026 at 5:28 pm EDT). No new retrieval.
  • S5 CFTC Innovation tracker

    Supports this fact

    Publisher
    CFTC
    Source-level locator
    Innovation Tracker, row 08/19/2026Fact-specific position not recorded in this snapshot
    Upstream relation
    supports
    Source checked (UTC day)
    Oct 5, 2026

    Limitation
    Category-wide consultation, not contract-level approval.

  • S4 CFTC NYMEX review-extension letter

    Corroborates this fact — not the governing source

    Publisher
    CFTC
    Locator
    PDF p. 1, footnote 3 (91 FR 54259; “comment period closing October 20, 2026”)
    Upstream relation
    supports
    Source checked (UTC day)
    Oct 5, 2026
    Source document date
    Sep 21, 2026

    Display rule
    Footnote 3 of this letter cites the CFTC request for comment with its comment period closing on the same date. It corroborates the deadline; the CFTC Innovation tracker (S5) remains the governing source.

    Limitation
    Deadline is not an approval decision or launch date. Footnote 3 cites the CFTC request for comment (91 FR 54259, August 21, 2026), comment period closing October 20, 2026; that Federal Register document itself was not retrieved.

Evidence

Evidence

How to read evidence