Metadata only — market data is not displayed on this site

Independent · Not investment advice

Timeline

Compute Futures Timeline

From GPU rental benchmarks to CME and ICE contract announcements, filings and review milestones, with Kalshi’s related compute markets in a lane of their own.

This chronology starts with selected GPU rental benchmark announcements in 2025, followed by CME and ICE futures plans and regulatory milestones in 2026: a CFTC request for comment, an extended CFTC review of the NYMEX contracts, a reported postponement of the planned CME launch, and an ICE Futures U.S. reference-data notice that set no listing date. A separate Kalshi lane records two documents about its related compute markets, which are event contracts and not futures. No entry in this chronology is, by itself, a launch, an approval or a trade.

Timeline edition · benchmark, CME, ICE and regulation entries checked (UTC day), covering developments through · Kalshi entries checked , covering through · targeted NYMEX documents checked Nov 9, 2026, covering the Nov 4 letter and rule record · a curated selection, not every milestone

Updated

Sources & update history
Published
Page updated
· targeted CFTC source check; baseline values and other checks are unchanged
NYMEX source follow-up
· targeted NYMEX source check; baseline values and other checks are unchanged
ICE source follow-up
· targeted ICE source check; baseline values and other checks are unchanged
Also changed
· edit of the page’s own text
CME source follow-up
· targeted CME source check; baseline values and other checks are unchanged
Contract data baseline
· the data panels on this page follow it · How dates work
Baseline scope
Four contracts (GPU1, GPU2, HPR, BKL); metadata only, no market data. Each fact keeps its own verification date; a page update is not a re-review of market facts.

Three distinctions

This chronology keeps three kinds of record apart. Each event below is labelled with what it was, and with what it was not.

  • Announcement · launch

    An announcement is not a launch. A plan, and the date it names, is not evidence that a contract became available or that anything traded.

  • Reference data · trading

    Reference data is not trading. Index data and hypothetical settlement prices help systems prepare; they are not trades.

  • Deadline · approval

    A review deadline is not an approval. The end of a review or comment period records no outcome on its own.

Kalshi lane Kalshi’s related compute markets are event contracts, not futures. A dated announcement or letter is not a launch, a listing or an approval of any Kalshi product, and a public-record observation made while preparing this edition is not an event in the chronology. Kalshi compute markets: event contracts and futures plans →

The regulatory status page interprets where each contract stands now; this page shows how the story developed. New to the terms? Compute Futures Explained.

Chronology

14 dated developments, oldest first. Spacing is by order, not by elapsed time. Every event shows its type and lane in words; open “Sources and qualification” for the document, its locator and how it was checked.

2025

  1. AnnouncementBenchmark

    Silicon Data announces a daily H100 rental index

    Silicon Data announced its daily H100 Rental Index (Bloomberg ticker SDH100RT), a benchmark of rental prices for NVIDIA H100 GPUs.

    What it was not: A benchmark provider’s announcement, shown as background. It is not a futures listing. The release calls the index the world’s first daily GPU rental benchmark; that is the provider’s description, not this site’s finding.

    Sources and qualification for May 20, 2025: Silicon Data announces a daily H100 rental index

    Editorial note This page does not say which version or methodology of any Silicon Data index a futures contract settles on; see the Benchmarks page for what is and is not confirmed.

    Document support

  2. AnnouncementBenchmark

    Silicon Data announces a B200 rental index and revises its H100 and A100 indices

    Silicon Data announced a B200 on-demand rental index and an update to its A100 and H100 rental indices, alongside new hyperscaler rental benchmarks on its portal.

    What it was not: Historical benchmark context. It is not evidence of a futures listing, and the methodology described then is not assumed to be the one used today.

    Sources and qualification for Dec 5, 2025: Silicon Data announces a B200 rental index and revises its H100 and A100 indices

    Document support

2026

  1. AnnouncementCME

    CME Group and Silicon Data announce plans for compute futures

    CME Group and Silicon Data announced plans to launch compute futures later in 2026.

    What it was not: The release announced a plan subject to regulatory review. It does not establish that a contract was listed or available to trade.

    Sources and qualification for May 12, 2026: CME Group and Silicon Data announce plans for compute futures

    Document support

  2. AnnouncementICE

    ICE and Ornn announce plans for GPU compute futures

    Intercontinental Exchange (ICE) and Ornn announced plans for GPU compute futures based on Ornn’s Compute Price Index (OCPI).

    What it was not: Plans subject to regulatory approval. Products named as future coverage are not a list of live contracts.

    Sources and qualification for May 19, 2026: ICE and Ornn announce plans for GPU compute futures

    Document support

  3. AnnouncementKalshi

    Kalshi announces GPU compute forward curves

    Kalshi announced forward curves for GPU compute and described them as a pricing benchmark derived from its own market data that is not a tradeable asset, separate from the underlying markets on its exchange.

    What it was not: An announcement of a derived data product, not a futures contract, a tradable market or a rental quote. It does not show that any Kalshi market was active on July 14 or when the first one opened, and it is not a CME or ICE benchmark.

    Sources and qualification for Jul 14, 2026: Kalshi announces GPU compute forward curves

    Editorial note July 14 is not Kalshi’s arrival: its October 2026 research paper says its GPU event markets date from March 2026. No exact March day is established, so none is placed on this timeline. The Kalshi profile keeps the event contracts, the curves and the planned futures apart.

    Document support

  4. AnnouncementCME

    CME announces H100 and B200 compute futures with an October 5 target date

    CME Group announced H100 and B200 compute futures, with trading planned to start on October 5, 2026, pending regulatory review. NYMEX’s submission of the two contracts to the CFTC (26-370) is dated the same day.

    What it was not: October 5 was a planned date, not a confirmed launch or trade. A September 28 CME notice later reported the launch postponed.

    Contracts named: GPU1, GPU2

    Sources and qualification for Aug 11, 2026: CME announces H100 and B200 compute futures with an October 5 target date

    Dates this record names

    Document support

  5. Regulator press releaseRegulation

    CFTC issues a request for comment on compute derivatives

    The CFTC issued a request for comment on the listing of compute derivatives contracts (press release 9286-26). It said comments would be accepted for 60 days after publication in the Federal Register.

    What it was not: A category-wide consultation, not approval of any CME or ICE contract. The comment deadline is the date printed in the Federal Register document, not 60 days counted from this release.

    Sources and qualification for Aug 19, 2026: CFTC issues a request for comment on compute derivatives

    Document support

  6. Federal Register publicationRegulation

    The request for comment is published in the Federal Register; comments due October 20

    The request for comment was published in the Federal Register as document 2026-17163 (91 FR 54259). Its DATES section says comments must be received on or before October 20, 2026.

    What it was not: The document’s ACTION is “Request for comment.” It is not a final rule or an approval of any product.

    Sources and qualification for Aug 21, 2026: The request for comment is published in the Federal Register; comments due October 20

    Dates this record names

    Document support

  7. Regulator letterCMERegulation

    CFTC extends its review of the NYMEX H100 and B200 submissions to November 9

    A CFTC letter dated September 21 extended the review period for NYMEX Submissions 26-370 and 26-370S (the proposed Silicon Data H100 and B200 Rental Index Futures) by 45 days, until the end of November 9, 2026.

    What it was not: It applies to the NYMEX submissions only, not to ICE. A review deadline is not an approval, and it does not promise a launch on November 10.

    Contracts named: GPU1, GPU2

    Sources and qualification for Sep 21, 2026: CFTC extends its review of the NYMEX H100 and B200 submissions to November 9

    Dates this record names

    Document support

  8. Exchange noticeCME

    CME Globex notice reports the compute futures launch postponed

    A CME Globex notice dated September 28 reported that the launch of compute futures, previously planned for the October 4 trading session, had been postponed pending regulatory review.

    What it was not: The notice names the October 4 session; the August announcement named October 5 as the trade date. They describe the same planned start, not two launches. The notice dates the report of the postponement, not necessarily the decision.

    Contracts named: GPU1, GPU2

    Sources and qualification for Sep 28, 2026: CME Globex notice reports the compute futures launch postponed

    Dates this record names

    Document support

  9. Exchange noticeICE

    ICE Futures U.S. announces planned reference data; no listing date set

    ICE Futures U.S. said Ornn Compute Price Index data, including hypothetical daily settlement prices, would be made available on its trading platform from Monday, October 5, 2026. It said HPR and BKL would be listed pending completion of the CFTC’s request-for-comment period, and that no listing date or timeline had been set.

    What it was not: Reference data and hypothetical settlement prices are not trading. The notice announced a plan; it does not show data delivery, a listing or any trade.

    Contracts named: HPR, BKL

    Sources and qualification for Sep 29, 2026: ICE Futures U.S. announces planned reference data; no listing date set

    Dates this record names

    Document support

  10. Comment letterKalshi

    Kalshi comment letter to the CFTC is dated October 20

    A 13-page comment letter from Kalshi entities, dated October 20, responds to the CFTC’s request for comment on compute derivatives (comment CFTC-2026-1850-0090, RIN 3038-AF77). Its Sections II and III discuss contract standards and perpetual futures.

    What it was not: A response to a category-wide consultation, not a product-specific relisting application, a CFTC approval or permission to trade a new futures product. The date is the letter’s own: receipt and posting dates were not captured, and the text was read in a publicly hosted copy, not the government original.

    Sources and qualification for Oct 20, 2026: Kalshi comment letter to the CFTC is dated October 20

    Document support

  11. Regulator letterCMERegulation

    NYMEX consents to a further 60-day review extension

    NYMEX consented to extend review through Jan 8, 2027, subject to an earlier date under the letter’s conditions.

    What it was not: An earlier date controls if another CFTC registrant self-certifies, obtains approval for, or otherwise lists a comparable contract, or if the Commission agrees to a shorter review period. This is conditional and is not an approval or a launch date.

    Contracts named: GPU1, GPU2

    Sources and qualification for Nov 4, 2026: NYMEX consents to a further 60-day review extension

    Dates this record names

    Document support

  12. Rule filing withdrawalCMERegulation

    NYMEX liquidity provider program filing marked withdrawn

    The CFTC rules record marks NYMEX submission 26-524 withdrawn on November 4. Its public filing names GPU1 and GPU2.

    What it was not: The withdrawal concerns the incentive program filing, not the product applications. The proposed November 10 program start was not a contract launch date.

    Contracts named: GPU1, GPU2

    Sources and qualification for Nov 4, 2026: NYMEX liquidity provider program filing marked withdrawn

    Document support

Published deadlines

Documents may set a scheduled deadline or state a conditional date. These dates are distinct from events that happened: reaching one approves, lists or launches nothing. “Upcoming” and “before the edition” are relative to this edition’s date, Nov 9, 2026, not to today; a date that has come does not tell you what, if anything, followed it.

  • Published deadline · date is before the Nov 9, 2026 edition; no outcome is recorded here

    Comment deadline for the CFTC request for comment

    Scope: Category-wide consultation on compute derivatives; not approval of an individual contract

    The end of a comment period, not an approval: it approves, rejects or lists no contract.

    Published in: the event that set it · Sources: TH07 (DATES), TH08 (PDF p. 1, footnote 3)

  • Conditional review date

    Conditional NYMEX review date

    Scope: GPU1 and GPU2 only, per the November 4 NYMEX letter

    An earlier date controls if another CFTC registrant self-certifies, obtains approval for, or otherwise lists a comparable contract, or if the Commission agrees to a shorter review period. This is not an approval or launch date.

    Published in: the event that set it · Sources: TH14 (PDF p. 1, final substantive paragraph)

Undated evidence

Evidence that matters to the story but has no established date of its own. It is kept out of the dated chronology rather than given an invented place in it.

CME clearing advisory 26-274 (revised): launch date TBD

The PDF attachment of CME’s revised clearing advisory 26-274 lists “Trade Date TBD” and “Initial Contracts TBD” (page 1) and “Pending All Relevant CFTC Regulatory Review Periods” (page 2). It was read on Oct 7, 2026 for the current data edition. The advisory’s web page shows a Notice Date of September 25, 2026; that is a page label, and no revision time of the PDF itself is confirmed, so this evidence is not placed on a date in the chronology.

Current status, from the contract data baseline

Contract data baseline · evidence cutoff

This block is the site’s recorded status for the four tracked contracts, with its own evidence. It follows the data edition above, not the timeline edition, and was not re-verified for this timeline. The historical documents above show selected records; they do not prove that no later notice exists.

Share and download

Prepared text for sharing. It keeps the edition date and points to this page, where every claim has its source.

Compute Futures Timeline, edition Nov 9, 2026: a sourced chronology from 2025 GPU rental benchmarks to CME and ICE contract announcements, a CFTC request for comment, an extended CFTC review and a postponed CME launch, with Kalshi’s related compute markets in their own lane. It records announcements, notices, letters and deadlines, not a launch, an approval or a trade.

https://computefuturesdata.com/learn/compute-futures-timeline/

Nothing is posted anywhere automatically, and sharing is not tracked.

Timeline image

Compute futures timeline image: selected milestones from May 2025 to October 2026, edition Nov 9, 2026
Selected milestones from this edition in one tall image (1080 × 8698 px). Its full text is the chronology above. Download the timeline image (PNG, 506 kB). A tall image may be cropped in social feeds; the cards below are the readable alternative.

Carousel cards

8 cards of 1080 × 1350 px. Each names the edition and this page, and keeps the qualification of every event it shows.

  1. Compute futures timeline card 1 of 8: what the timeline covers Download card 1 (PNG, 98 kB)
  2. Compute futures timeline card 2 of 8: 2025: rental benchmarks Download card 2 (PNG, 75 kB)
  3. Compute futures timeline card 3 of 8: May–Jul 2026: plans and curves Download card 3 (PNG, 88 kB)
  4. Compute futures timeline card 4 of 8: Aug 2026: contracts, consultation Download card 4 (PNG, 97 kB)
  5. Compute futures timeline card 5 of 8: Sep 2026: review and notices Download card 5 (PNG, 99 kB)
  6. Compute futures timeline card 6 of 8: Oct 2026: a Kalshi comment letter Download card 6 (PNG, 80 kB)
  7. Compute futures timeline card 7 of 8: Nov 2026: NYMEX filings Download card 7 (PNG, 70 kB)
  8. Compute futures timeline card 8 of 8: Deadlines and current evidence Download card 8 (PNG, 98 kB)

Link preview image: 1200 × 630 PNG (42 kB).

Sources

Timeline sources use their own numbers (TH01–TH16). Where one is the same document as a source in the data snapshot, it says so and counts once; where it is also a source on the Kalshi profile, it names that number. Two further snapshot sources support a supporting detail and the undated note.

  1. TH01 Silicon Data press release on its H100 Rental Index (opens in a new tab)

    Silicon Data · document dated

    Locator
    Dateline “New York • May 20, 2025”; opening paragraph (H100 Rental Index, Bloomberg ticker SDH100RT, updated daily)
    How it was checked
    Retrieved and read for this edition.
    Checked (UTC day)
    Cited by
    2025-05-20
  2. TH02 Silicon Data press release on revised A100/H100 indices and a B200 index (opens in a new tab)

    Silicon Data · document dated

    Locator
    Dateline “New York, NY — [12/05/2025]”; opening paragraph; sections “Revised A100 and H100 Rental Indices” and the B200 index section
    How it was checked
    Retrieved and read for this edition.
    Checked (UTC day)
    Cited by
    2025-12-05
  3. TH03 CME Group press release on its compute futures partnership with Silicon Data (opens in a new tab)

    CME Group · document dated

    Locator
    Release date and opening paragraph (plans for compute futures later in 2026); regulatory-review qualification
    How it was checked
    CME Group’s website terms prohibit automated access, so this page was not re-retrieved for this edition; it was read in the editorial research on Oct 8, 2026.
    Checked (UTC day)
    Cited by
    2026-05-12
  4. TH04 ICE and Ornn announcement of planned GPU compute futures (opens in a new tab)

    Intercontinental Exchange (ICE) · document dated · same document as snapshot source S10 (counted once)

    Locator
    Release date; opening paragraph (planned GPU compute futures on Ornn’s Compute Price Index, OCPI); subject-to-regulatory-approval paragraph
    How it was checked
    Same document as snapshot source S10 (checked Oct 5, 2026). An automated request for this edition was refused (HTTP 403) and was not retried around the block; ICE’s Sep 29 notice (TH10) independently repeats the May 19 date.
    Checked (UTC day)
    Cited by
    2026-05-19
  5. TH05 CME Group press release announcing H100 and B200 compute futures for October 5 (opens in a new tab)

    CME Group · document dated · same document as snapshot source S19 (counted once)

    Locator
    Release date; opening paragraph and product description (H100 and B200 compute futures, October 5, pending regulatory review)
    How it was checked
    Same document as snapshot source S19 (checked Oct 5, 2026). CME Group’s website terms prohibit automated access, so this page was not re-retrieved for this edition; it was read in the editorial research on Oct 8, 2026.
    Checked (UTC day)
    Cited by
    2026-08-11
  6. TH06 CFTC press release 9286-26: request for comment on listing compute derivatives contracts (opens in a new tab)

    U.S. Commodity Futures Trading Commission (CFTC) · document dated

    Locator
    Release Number 9286-26; date August 19, 2026; first paragraph (request for comment issued); last paragraph (comments accepted for 60 days following Federal Register publication)
    How it was checked
    Retrieved and read for this edition.
    Checked (UTC day)
    Cited by
    2026-08-19
  7. TH07 Federal Register document 2026-17163, “Request for Comment on the Listing of Compute Derivatives Contracts”, 91 FR 54259 (opens in a new tab)

    Office of the Federal Register (CFTC document) · document dated

    Locator
    Publication header (Vol. 91, No. 161, Friday, August 21, 2026; pp. 54259–54264); ACTION: “Request for comment.”; DATES: “Comments must be received on or before October 20, 2026.”
    How it was checked
    The published text and document metadata were retrieved and read for this edition through the Federal Register’s published full-text and API addresses (the HTML page answered automated requests with an access check, which was not bypassed).
    Checked (UTC day)
  8. TH08 CFTC letter extending the review of NYMEX Submissions 26-370 and 26-370S (opens in a new tab)

    U.S. Commodity Futures Trading Commission (CFTC), Division of Market Oversight · document dated · same document as snapshot source S4 (counted once)

    Locator
    PDF p. 1: date line (September 21, 2026); “Re:” line; extension paragraph (“for an additional 45 days, until the end of November 9, 2026”); footnote 3 (91 FR 54259, comment period closing October 20, 2026). P. 2 holds only the contact line and signature
    How it was checked
    Same document as snapshot source S4. Retrieved for this edition; the file is byte-identical to the snapshot’s recorded retrieval.
    Checked (UTC day)
  9. TH09 CME Globex notice of September 28, 2026 (compute futures update) (opens in a new tab)

    CME Group · document dated

    Locator
    Section “Update Compute Futures - Postponed” and the paragraph directly below it (other sections of the notice concern other products)
    How it was checked
    CME Group’s website terms prohibit automated access, so this page was not re-retrieved for this edition; it was read in the editorial research on Oct 8, 2026.
    Checked (UTC day)
    Cited by
    2026-09-28
  10. TH10 ICE Futures U.S. exchange notice: new compute index reference data (September 29, 2026) (opens in a new tab)

    ICE Futures U.S. · document dated · same document as snapshot source S20 (counted once)

    Locator
    PDF p. 1: date (Tuesday September 29, 2026); heading (reference data available Monday, October 5, 2026); paragraph 1 (“As previously announced on May 19, 2026”); paragraph 2 (listing pending completion of the CFTC request-for-comment period; “no listing date or timeline has been set”); paragraph 3 (hypothetical daily settlement prices)
    How it was checked
    Same document as snapshot source S20. Retrieved for this edition; the file is byte-identical to the snapshot’s recorded retrieval.
    Checked (UTC day)
  11. TH11 Kalshi announcement of GPU compute forward curves (opens in a new tab)

    Kalshi · document dated · profile source K01

    Locator
    Dateline “July 14, 2026”; the passages describing the forward curves as not tradable and pointing to the separate underlying markets
    How it was checked
    Read in the editorial research and re-checked on Oct 23, 2026 for its date and for the sentence that separates the curves from the tradable underlying markets.
    Checked (UTC day)
    Cited by
    2026-07-14
  12. TH12 Kalshi comment letter to the CFTC (comment CFTC-2026-1850-0090), dated October 20, 2026 (opens in a new tab)

    Kalshi entities (comment on regulations.gov) · document dated · profile source K05

    Locator
    Page 1: the date (October 20, 2026), RIN 3038-AF77 and the three Kalshi entities; Sections II and III (contract standards; perpetual futures)
    How it was checked
    Read in the editorial research through a publicly hosted copy of the 13-page letter, not the government original: the official comment page and attachment returned HTTP 403 to automated requests and were not bypassed. Byte identity with the original is unverified, no digest is held, and receipt and posting dates were not captured. The official search metadata corroborates the comment identifier. Not re-retrieved for this edition.
    Checked (UTC day)
    Cited by
    2026-10-20
  13. TH13 Kalshi research paper on AI infrastructure markets (October 2026) (opens in a new tab)

    Kalshi Research · document dated · profile source K06

    Locator
    The roadmap discussion: GPU event markets dating from March 2026, and compute perpetual and dated futures subject to regulatory approval (the PDF page of each statement was not recorded in the research notes)
    How it was checked
    Read in full in the editorial research, one figure inspected; not re-retrieved for this edition. The cover shows no publication day.
    Checked (UTC day)
    Cited by
    2026-07-14
  14. TH14 NYMEX consent to a further review extension (opens in a new tab)

    NYMEX (filed with CFTC) · document dated

    Locator
    PDF p. 1, date and final substantive paragraph: two products, conditional consent and earlier-date conditions
    How it was checked
    Both PDF pages were retrieved and read for the targeted NYMEX follow-up.
    Checked (UTC day)
  15. TH15 CFTC rules record 65759: GPU Compute Liquidity Provider Program (opens in a new tab)

    CFTC · status dated

    Locator
    Description, Official Receipt Date, Status, Date and Associated Documents; Date is the recorded status date
    How it was checked
    Read the official record fields and links, not the nonpublic submission.
    Checked (UTC day)
    Cited by
    2026-11-04
  16. TH16 NYMEX rule submission 26-524 (opens in a new tab)

    NYMEX (filed with CFTC) · document dated

    Locator
    PDF p. 1, date and opening paragraphs; p. 2, Exhibit 1, Product Scope and Program Term
    How it was checked
    Read both pages of the public submission linked from the rules record.
    Checked (UTC day)
    Cited by
    2026-11-04
  17. S8 NYMEX Submission 26-370 (opens in a new tab)

    NYMEX, filed with CFTC · data snapshot source, listed with its full record in the source registry

    Snapshot locator
    PDF pp. 2–3 product table; pp. 5–6 Chapters 1045/1047
    Checked (UTC day)
    Oct 5, 2026 (snapshot check; not re-checked for this timeline)
    Cited by
    2026-08-11
  18. S3 CME revised clearing advisory 26-274 (opens in a new tab)

    CME Group · data snapshot source, listed with its full record in the source registry

    Snapshot locator
    Document title and revised-notice body
    Checked (UTC day)
    Oct 5, 2026 (snapshot check; not re-checked for this timeline)
    Cited by
    undated note

About this edition

  • Scope. Selected developments relevant to the four tracked CME and ICE H100/B200 contracts, with 2025 benchmark background, and, in their own lane, two documents about Kalshi’s related compute markets. It is not a history of every compute derivative, of every prediction-market contract or of every exchange notice.
  • Dates. Dates are as the documents state them, date only, in the documents’ own terms; no time of day is added. A retrieval day, a public-API observation, the data edition and this site’s publication are not events. The Kalshi letter’s date is its own: receipt and posting dates were not captured.
  • Checks, by lane. The benchmark, CME, ICE and regulation sources were checked on Oct 8, 2026 and this edition did not re-check them on Oct 23, 2026; the targeted November NYMEX follow-up covers only the newly cited letter, rule filing and product records. The Kalshi sources were checked on Oct 23, 2026. Each source says how. This edition does not claim to include every later notice, any activation of reference data, or any actual trade. It is a curated historical edition, not a real-time record.
  • Separate status. The current-status block follows the data edition of Oct 8, 2026 and its own evidence.

Ledger cfd-timeline-2026-11-09, version 1.1.0. Found an error? See the corrections policy. Not investment advice; not affiliated with CME Group, ICE, Silicon Data or Ornn.

Evidence for this page

Each block lists the facts behind one displayed value and every source reference recorded for them. “Source-level locator” means no fact-specific position was recorded in this snapshot. How to read evidence

Evidence · GPU1 regulatory status

Regulatory status

Verified Oct 5, 2026

Approval pending

Fact checked (UTC day)
Fact verified (UTC day)
Effective
  • S1 CFTC GPU1 product record 62544

    Supports this fact

    Publisher
    CFTC
    Locator
    Status
    Upstream relation
    supports
    Source checked (UTC day)

    Limitation
    Does not establish a production execution.

  • S3 CME revised clearing advisory 26-274

    Checked context — does not confirm a value

    Publisher
    CME Group
    Locator
    PDF p. 2, qualifier “Pending All Relevant CFTC Regulatory Review Periods”Recorded position where this field was checked. It is not evidence of a value; the field remains unknown.
    Upstream relation
    checked context
    Source checked (UTC day)
    Landing-page notice date
    Notice Date as labelled on the landing page. Not a document date and not a revision time of the attachment.
    Attachment read (ET)
    · Text read and both pages inspected. This does not change the fact’s check date.
    Attachment revision time
    Not confirmed

    Attachment limitation
    Read once on the observation date; the original PDF bytes were not saved, so no digest is recorded. The PDF carries no separately confirmed revision timestamp, and it states no actual launch date.

    Attachment of S3, the same notice as its landing page — not an independent confirmation.

    Limitation
    The landing page states the date as TBD. Its revised two-page PDF attachment (S3-A1) was read on 2026-10-07: Listing Date “Trade Date TBD”, Initial Contracts “TBD”, and a pending-CFTC-review qualifier. The landing page labels its Notice date 2026-09-25; that is a page label, not a date printed in the PDF, and no separate PDF revision timestamp is confirmed. No copy or digest of the PDF is archived in this dataset.

CFTC wording

Verified Oct 5, 2026

Approval Pending (90)

Fact checked (UTC day)
Fact verified (UTC day)
Effective

Record date

Verified Oct 5, 2026

Sep 21, 2026

Fact checked (UTC day)
Fact verified (UTC day)
Effective

Earlier review deadline (September letter)

Verified Oct 5, 2026

Nov 9, 2026 — a deadline, not an approval

Fact checked (UTC day)
Fact verified (UTC day)
Effective
  • S4 CFTC NYMEX review-extension letter

    Supports this fact

    Publisher
    CFTC
    Locator
    PDF p. 1, concluding paragraph
    Upstream relation
    supports
    Source checked (UTC day)
    Source document date

    Limitation
    Deadline is not an approval decision or launch date. Footnote 3 cites the CFTC request for comment (91 FR 54259, August 21, 2026), comment period closing October 20, 2026; that Federal Register document itself was not retrieved.

Evidence · GPU1 listing and launch

Launch date state

Verified Oct 5, 2026

TBD

Source follow-up (UTC day)
· Relevant source body re-read; value unchanged. Original edition check below is preserved.
Fact checked (UTC day)
Fact verified (UTC day)
Effective
Not known

The revised CME advisory 26-274 lists the trade date and initial contracts as TBD. Both pages of its PDF attachment were read on October 7, 2026. The advisory’s landing page labels its Notice date September 25, 2026 (recorded from a screenshot of that page); a separate PDF revision timestamp has not been confirmed. The attachment gives no actual launch date, so the launch date stays TBD.

  • S3 CME revised clearing advisory 26-274

    Supports this fact

    Publisher
    CME Group
    Locator
    Retrieved document title
    Upstream relation
    supports
    Source checked (UTC day)
    Landing-page notice date
    Notice Date as labelled on the landing page. Not a document date and not a revision time of the attachment.

    Limitation
    The landing page states the date as TBD. Its revised two-page PDF attachment (S3-A1) was read on 2026-10-07: Listing Date “Trade Date TBD”, Initial Contracts “TBD”, and a pending-CFTC-review qualifier. The landing page labels its Notice date 2026-09-25; that is a page label, not a date printed in the PDF, and no separate PDF revision timestamp is confirmed. No copy or digest of the PDF is archived in this dataset.

  • S3 CME revised clearing advisory 26-274

    Supports this fact

    Locator
    PDF p. 1, Listing Date row (“Trade Date TBD”) and Initial Contracts row (“TBD”)
    Upstream relation
    supports
    Attachment read (ET)
    · Text read and both pages inspected. This does not change the fact’s check date.
    Attachment revision time
    Not confirmed

    Attachment limitation
    Read once on the observation date; the original PDF bytes were not saved, so no digest is recorded. The PDF carries no separately confirmed revision timestamp, and it states no actual launch date.

    Limitation and source details: the first S3 reference above.

    Attachment of S3, the same notice as its landing page — not an independent confirmation.

Current launch date

Verified Oct 5, 2026

TBD — no date is filled in

Source follow-up (UTC day)
· Relevant source body re-read; value unchanged. Original edition check below is preserved.
Fact checked (UTC day)
Fact verified (UTC day)
Effective
Not known

Original announced trade date (historical)

Verified Oct 5, 2026

Oct 5, 2026 — superseded, historical only

Fact checked (UTC day)
Fact verified (UTC day)
Effective

Listing status (site classification)

Site classification · verified Oct 5, 2026

Postponed — derived from the TBD notice; shown as “Launch date TBD”

Fact checked (UTC day)
Fact verified (UTC day)
Effective
Not known

Evidence · GPU1 trading evidence

Trading evidence (site assessment)

Site classification · verified Oct 5, 2026

Not confirmed. This describes the evidence assessment; it does not claim that no trading occurred.

Fact checked (UTC day)
Fact verified (UTC day)
Effective
Not known

No production trade has been verified for any of the four contracts in this edition. Announced dates and calendar fields are not treated as trades, and no volume or open interest is shown. ICE says reference data including hypothetical daily settlement prices is available from Oct 5, 2026 for system development; those values are not trades or production settlements and are not shown. This is an evidence assessment, not a statement that no trading occurred.

  • S1 CFTC GPU1 product record 62544

    Supports this fact

    Publisher
    CFTC
    Source-level locator
    Organization / Product Name / Status / DateFact-specific position not recorded in this snapshot
    Upstream relation
    supports
    Source checked (UTC day)

    Limitation
    Does not establish a production execution.

  • S3 CME revised clearing advisory 26-274

    Supports this fact

    Publisher
    CME Group
    Source-level locator
    Document title and revised-notice bodyFact-specific position not recorded in this snapshot
    Upstream relation
    supports
    Source checked (UTC day)
    Landing-page notice date
    Notice Date as labelled on the landing page. Not a document date and not a revision time of the attachment.

    Limitation
    The landing page states the date as TBD. Its revised two-page PDF attachment (S3-A1) was read on 2026-10-07: Listing Date “Trade Date TBD”, Initial Contracts “TBD”, and a pending-CFTC-review qualifier. The landing page labels its Notice date 2026-09-25; that is a page label, not a date printed in the PDF, and no separate PDF revision timestamp is confirmed. No copy or digest of the PDF is archived in this dataset.

First production trade

Not confirmed

Not confirmed

Fact checked (UTC day)
Fact verified (UTC day)
No verification date
Effective
Not known

Evidence · GPU2 regulatory status

Regulatory status

Verified Oct 5, 2026

Approval pending

Fact checked (UTC day)
Fact verified (UTC day)
Effective
  • S2 CFTC GPU2 product record 62545

    Supports this fact

    Publisher
    CFTC
    Locator
    Status
    Upstream relation
    supports
    Source checked (UTC day)
  • S3 CME revised clearing advisory 26-274

    Checked context — does not confirm a value

    Publisher
    CME Group
    Locator
    PDF p. 2, qualifier “Pending All Relevant CFTC Regulatory Review Periods”Recorded position where this field was checked. It is not evidence of a value; the field remains unknown.
    Upstream relation
    checked context
    Source checked (UTC day)
    Landing-page notice date
    Notice Date as labelled on the landing page. Not a document date and not a revision time of the attachment.
    Attachment read (ET)
    · Text read and both pages inspected. This does not change the fact’s check date.
    Attachment revision time
    Not confirmed

    Attachment limitation
    Read once on the observation date; the original PDF bytes were not saved, so no digest is recorded. The PDF carries no separately confirmed revision timestamp, and it states no actual launch date.

    Attachment of S3, the same notice as its landing page — not an independent confirmation.

    Limitation
    The landing page states the date as TBD. Its revised two-page PDF attachment (S3-A1) was read on 2026-10-07: Listing Date “Trade Date TBD”, Initial Contracts “TBD”, and a pending-CFTC-review qualifier. The landing page labels its Notice date 2026-09-25; that is a page label, not a date printed in the PDF, and no separate PDF revision timestamp is confirmed. No copy or digest of the PDF is archived in this dataset.

CFTC wording

Verified Oct 5, 2026

Approval Pending (90)

Fact checked (UTC day)
Fact verified (UTC day)
Effective

Record date

Verified Oct 5, 2026

Sep 21, 2026

Fact checked (UTC day)
Fact verified (UTC day)
Effective

Earlier review deadline (September letter)

Verified Oct 5, 2026

Nov 9, 2026 — a deadline, not an approval

Fact checked (UTC day)
Fact verified (UTC day)
Effective
  • S4 CFTC NYMEX review-extension letter

    Supports this fact

    Publisher
    CFTC
    Locator
    PDF p. 1, concluding paragraph
    Upstream relation
    supports
    Source checked (UTC day)
    Source document date

    Limitation
    Deadline is not an approval decision or launch date. Footnote 3 cites the CFTC request for comment (91 FR 54259, August 21, 2026), comment period closing October 20, 2026; that Federal Register document itself was not retrieved.

Evidence · GPU2 listing and launch

Launch date state

Verified Oct 5, 2026

TBD

Source follow-up (UTC day)
· Relevant source body re-read; value unchanged. Original edition check below is preserved.
Fact checked (UTC day)
Fact verified (UTC day)
Effective
Not known

The revised CME advisory 26-274 lists the trade date and initial contracts as TBD. Both pages of its PDF attachment were read on October 7, 2026. The advisory’s landing page labels its Notice date September 25, 2026 (recorded from a screenshot of that page); a separate PDF revision timestamp has not been confirmed. The attachment gives no actual launch date, so the launch date stays TBD.

  • S3 CME revised clearing advisory 26-274

    Supports this fact

    Publisher
    CME Group
    Locator
    Retrieved document title
    Upstream relation
    supports
    Source checked (UTC day)
    Landing-page notice date
    Notice Date as labelled on the landing page. Not a document date and not a revision time of the attachment.

    Limitation
    The landing page states the date as TBD. Its revised two-page PDF attachment (S3-A1) was read on 2026-10-07: Listing Date “Trade Date TBD”, Initial Contracts “TBD”, and a pending-CFTC-review qualifier. The landing page labels its Notice date 2026-09-25; that is a page label, not a date printed in the PDF, and no separate PDF revision timestamp is confirmed. No copy or digest of the PDF is archived in this dataset.

  • S3 CME revised clearing advisory 26-274

    Supports this fact

    Locator
    PDF p. 1, Listing Date row (“Trade Date TBD”) and Initial Contracts row (“TBD”)
    Upstream relation
    supports
    Attachment read (ET)
    · Text read and both pages inspected. This does not change the fact’s check date.
    Attachment revision time
    Not confirmed

    Attachment limitation
    Read once on the observation date; the original PDF bytes were not saved, so no digest is recorded. The PDF carries no separately confirmed revision timestamp, and it states no actual launch date.

    Limitation and source details: the first S3 reference above.

    Attachment of S3, the same notice as its landing page — not an independent confirmation.

Current launch date

Verified Oct 5, 2026

TBD — no date is filled in

Source follow-up (UTC day)
· Relevant source body re-read; value unchanged. Original edition check below is preserved.
Fact checked (UTC day)
Fact verified (UTC day)
Effective
Not known

Original announced trade date (historical)

Verified Oct 5, 2026

Oct 5, 2026 — superseded, historical only

Fact checked (UTC day)
Fact verified (UTC day)
Effective

Listing status (site classification)

Site classification · verified Oct 5, 2026

Postponed — derived from the TBD notice; shown as “Launch date TBD”

Fact checked (UTC day)
Fact verified (UTC day)
Effective
Not known

Evidence · GPU2 trading evidence

Trading evidence (site assessment)

Site classification · verified Oct 5, 2026

Not confirmed. This describes the evidence assessment; it does not claim that no trading occurred.

Fact checked (UTC day)
Fact verified (UTC day)
Effective
Not known

No production trade has been verified for any of the four contracts in this edition. Announced dates and calendar fields are not treated as trades, and no volume or open interest is shown. ICE says reference data including hypothetical daily settlement prices is available from Oct 5, 2026 for system development; those values are not trades or production settlements and are not shown. This is an evidence assessment, not a statement that no trading occurred.

  • S2 CFTC GPU2 product record 62545

    Supports this fact

    Publisher
    CFTC
    Source-level locator
    Organization / Product Name / Status / DateFact-specific position not recorded in this snapshot
    Upstream relation
    supports
    Source checked (UTC day)
  • S3 CME revised clearing advisory 26-274

    Supports this fact

    Publisher
    CME Group
    Source-level locator
    Document title and revised-notice bodyFact-specific position not recorded in this snapshot
    Upstream relation
    supports
    Source checked (UTC day)
    Landing-page notice date
    Notice Date as labelled on the landing page. Not a document date and not a revision time of the attachment.

    Limitation
    The landing page states the date as TBD. Its revised two-page PDF attachment (S3-A1) was read on 2026-10-07: Listing Date “Trade Date TBD”, Initial Contracts “TBD”, and a pending-CFTC-review qualifier. The landing page labels its Notice date 2026-09-25; that is a page label, not a date printed in the PDF, and no separate PDF revision timestamp is confirmed. No copy or digest of the PDF is archived in this dataset.

First production trade

Not confirmed

Not confirmed

Fact checked (UTC day)
Fact verified (UTC day)
No verification date
Effective
Not known

Evidence · HPR regulatory status

Regulatory status

Not confirmed

Current product-level regulatory status was not established in the sources checked. ICE Futures U.S.’s Sep 29, 2026 notice (S20) says listing awaits completion of the CFTC’s request-for-comment period; it gives no product-level CFTC status. Only the first page of the exchange’s rule-filing and notice lists was reviewed (as shown on Oct 5, 2026), so this is not an exhaustive filing search and does not show that no filing or approval exists.

Fact checked (UTC day)
Fact verified (UTC day)
No verification date
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:44 pm EDT, using the saved copy of S17 (retrieved Oct 5, 2026 at 5:30 pm EDT), S18 (retrieved Oct 5, 2026 at 5:30 pm EDT) and S20 (retrieved Oct 5, 2026 at 5:31 pm EDT). No new retrieval. Not repeated for the Oct 8, 2026 edition.

ICE’s current product-level regulatory status and regulatory pathway were not established in the sources checked. ICE’s Sep 29, 2026 notice says HPR and BKL will be listed pending completion of the CFTC’s request-for-comment period and that no listing date or timeline has been set; it gives no product-level CFTC status. The expiry calendar’s first trading date (FTD) is a calendar field and does not confirm a launch or a trade. Only the first page of ICE’s rule-filing and notice lists was reviewed, so the absence of a filing or approval cannot be claimed.

  • S10 ICE and Ornn product-program announcement

    Checked context — does not confirm a value

    Publisher
    ICE
    Source-level locator
    May 19 announcement: benchmark and regulatory caveatFact-specific position not recorded in this snapshot
    Upstream relation
    checked context
    Source checked (UTC day)
    Source document date

    Limitation
    Historical announcement does not establish current product-level regulatory state.

  • S17 ICE Futures U.S. Regulation

    Checked context — does not confirm a value

    Publisher
    ICE Futures U.S.
    Source-level locator
    Regulation introduction; Rulebook and Rule Filings sectionsFact-specific position not recorded in this snapshot
    Upstream relation
    checked context
    Source checked (UTC day)

    Limitation
    Static HTML exposed only the Energy Forms tab. A headless-browser render (2026-10-05 21:30 UTC) showed the first page of Rule Filings (100 titles, Mar 2 – Oct 5, 2026; titles only) and the Rulebook chapter list. No title on that page mentions compute, Ornn, OCPI or GPU, and the chapter list names Chapter 34 “OKX Futures”. Later pages and generic filings were not opened, so this is not an exhaustive filing search.

  • S18 ICE Futures U.S. Notices

    Checked context — does not confirm a value

    Publisher
    ICE Futures U.S.
    Source-level locator
    Exchange Notices sectionFact-specific position not recorded in this snapshot
    Upstream relation
    checked context
    Source checked (UTC day)

    Limitation
    Static HTML lacked the notice list. A headless-browser render (2026-10-05 21:30 UTC) showed page 1 of Exchange Notices (100 rows, Feb 4 – Oct 5, 2026), including one compute notice (S20). Later pages and Member and Disciplinary notices were not reviewed, so the absence of another notice cannot be claimed.

  • S20 ICE Futures U.S. Exchange Notice: compute index reference data (Sep 29, 2026)

    Checked context — does not confirm a value

    Publisher
    ICE Futures U.S.
    Locator
    PDF p. 1, paragraph 2 (listing “pending completion of the request for comment period”)Recorded position where this field was checked. It is not evidence of a value; the field remains unknown.
    Upstream relation
    checked context
    Source checked (UTC day)
    Source document date

    Limitation
    States the exchange’s position as of Sep 29, 2026. It sets no listing date, gives no CFTC product-level status for HPR or BKL, and does not show whether a later announcement exists. The reference data it describes, including hypothetical daily settlement prices, is not trading or production settlement and is not imported.

Regulatory pathway

Not confirmed

Not confirmed

Fact checked (UTC day)
Fact verified (UTC day)
No verification date
Effective
Not known

Regulatory status date

Not confirmed

Not confirmed

Fact checked (UTC day)
Fact verified (UTC day)
No verification date
Effective
Not known

Evidence · HPR listing and launch

Listing status (site classification)

Site classification · verified Oct 5, 2026

Specifications published. A publication classification, not a legal listing conclusion.

Fact checked (UTC day)
Fact verified (UTC day)
Effective
Not known
  • S6 ICE HPR official product page

    Supports this fact

    Publisher
    ICE Futures U.S.
    Source-level locator
    Market Specifications headingsFact-specific position not recorded in this snapshot
    Upstream relation
    supports
    Source checked (UTC day)

    Same reference family as S12 — one family, not independent confirmations.

    Limitation
    Quote denominator differs between quotation and fluctuation sections. At the Oct 5, 2026 check a lower city-time table conflicted with the explicit session text; ICE’s page has since been updated and now agrees (source follow-up, Oct 23, 2026).

  • S12 ICE HPR generated specification PDF

    Supports this fact

    Publisher
    ICE Futures U.S.
    Source-level locator
    PDF pp. 1–2 field labelsFact-specific position not recorded in this snapshot
    Upstream relation
    supports
    Source checked (UTC day)

    Same reference family as S6 — one family, not independent confirmations.

    Limitation
    PDF displayed date 2026-10-05 is not treated as a rule effective date; shares source family with S6.

Exchange listing statement

Verified Oct 5, 2026

ICE’s Sep 29, 2026 notice says the contract will be listed pending completion of the CFTC’s request-for-comment period, and that no listing date or timeline has been set. That is the exchange’s position on the notice date, not a regulatory decision.

Fact checked (UTC day)
Fact verified (UTC day)
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:39 pm EDT, using the saved copy of S20 (retrieved Oct 5, 2026 at 5:31 pm EDT). No new retrieval. Not repeated for the Oct 8, 2026 edition.

ICE’s current product-level regulatory status and regulatory pathway were not established in the sources checked. ICE’s Sep 29, 2026 notice says HPR and BKL will be listed pending completion of the CFTC’s request-for-comment period and that no listing date or timeline has been set; it gives no product-level CFTC status. The expiry calendar’s first trading date (FTD) is a calendar field and does not confirm a launch or a trade. Only the first page of ICE’s rule-filing and notice lists was reviewed, so the absence of a filing or approval cannot be claimed.

  • S20 ICE Futures U.S. Exchange Notice: compute index reference data (Sep 29, 2026)

    Supports this fact

    Publisher
    ICE Futures U.S.
    Locator
    PDF p. 1, paragraph 2 (listing “pending completion of the request for comment period”)
    Upstream relation
    supports
    Source checked (UTC day)
    Source document date

    Limitation
    States the exchange’s position as of Sep 29, 2026. It sets no listing date, gives no CFTC product-level status for HPR or BKL, and does not show whether a later announcement exists. The reference data it describes, including hypothetical daily settlement prices, is not trading or production settlement and is not imported.

Launch date state

Verified Oct 5, 2026

TBD — No listing date set in ICE’s Sep 29, 2026 notice

Fact checked (UTC day)
Fact verified (UTC day)
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:39 pm EDT, using the saved copy of S20 (retrieved Oct 5, 2026 at 5:31 pm EDT). No new retrieval. Not repeated for the Oct 8, 2026 edition.

Current launch date

Verified Oct 5, 2026

TBD — no date is filled in

Fact checked (UTC day)
Fact verified (UTC day)
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:39 pm EDT, using the saved copy of S20 (retrieved Oct 5, 2026 at 5:31 pm EDT). No new retrieval. Not repeated for the Oct 8, 2026 edition.

Calendar FTD (exchange calendar field)

Verified Oct 5, 2026

Oct 5, 2026. This exchange calendar field does not independently confirm production launch or an actual trade.

Fact checked (UTC day)
Fact verified (UTC day)
Effective
Not known

Reference data (exchange statement)

Verified Oct 5, 2026

ICE’s Sep 29, 2026 notice says it makes index reference data, including hypothetical daily settlement prices, available from Oct 5, 2026 for system development. These are not trades, a launch or production settlements, and none of the values are shown on this site.

Fact checked (UTC day)
Fact verified (UTC day)
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:39 pm EDT, using the saved copy of S20 (retrieved Oct 5, 2026 at 5:31 pm EDT). No new retrieval. Not repeated for the Oct 8, 2026 edition.

No production trade has been verified for any of the four contracts in this edition. Announced dates and calendar fields are not treated as trades, and no volume or open interest is shown. ICE says reference data including hypothetical daily settlement prices is available from Oct 5, 2026 for system development; those values are not trades or production settlements and are not shown. This is an evidence assessment, not a statement that no trading occurred.

No market-data display licence is recorded for this site, so price, settlement, volume, open-interest and index-history components are off. This does not mean the market has no data.

Evidence · HPR trading evidence

Trading evidence (site assessment)

Site classification · verified Oct 5, 2026

Not confirmed. This describes the evidence assessment; it does not claim that no trading occurred.

Fact checked (UTC day)
Fact verified (UTC day)
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:39 pm EDT, using the saved copy of S20 (retrieved Oct 5, 2026 at 5:31 pm EDT). No new retrieval. Not repeated for the Oct 8, 2026 edition.

ICE’s current product-level regulatory status and regulatory pathway were not established in the sources checked. ICE’s Sep 29, 2026 notice says HPR and BKL will be listed pending completion of the CFTC’s request-for-comment period and that no listing date or timeline has been set; it gives no product-level CFTC status. The expiry calendar’s first trading date (FTD) is a calendar field and does not confirm a launch or a trade. Only the first page of ICE’s rule-filing and notice lists was reviewed, so the absence of a filing or approval cannot be claimed.

No production trade has been verified for any of the four contracts in this edition. Announced dates and calendar fields are not treated as trades, and no volume or open interest is shown. ICE says reference data including hypothetical daily settlement prices is available from Oct 5, 2026 for system development; those values are not trades or production settlements and are not shown. This is an evidence assessment, not a statement that no trading occurred.

  • S6 ICE HPR official product page

    Supports this fact

    Publisher
    ICE Futures U.S.
    Source-level locator
    Market Specifications headingsFact-specific position not recorded in this snapshot
    Upstream relation
    supports
    Source checked (UTC day)

    Same reference family as S12 — one family, not independent confirmations.

    Limitation
    Quote denominator differs between quotation and fluctuation sections. At the Oct 5, 2026 check a lower city-time table conflicted with the explicit session text; ICE’s page has since been updated and now agrees (source follow-up, Oct 23, 2026).

  • S14 ICE HPR expiry calendar

    Supports this fact

    Publisher
    ICE Futures U.S.
    Source-level locator
    Expiry Details table, Nov26–Dec27 rowsFact-specific position not recorded in this snapshot
    Upstream relation
    supports
    Source checked (UTC day)

    Limitation
    FTD is an exchange calendar field, not evidence of an actual execution. FSD is not automatically final payment date.

  • S20 ICE Futures U.S. Exchange Notice: compute index reference data (Sep 29, 2026)

    Checked context — does not confirm a value

    Publisher
    ICE Futures U.S.
    Locator
    PDF p. 1, paragraphs 2–3 (no listing date set; reference data with hypothetical settlement prices)Recorded position where this field was checked. It is not evidence of a value; the field remains unknown.
    Upstream relation
    checked context
    Source checked (UTC day)
    Source document date

    Limitation
    States the exchange’s position as of Sep 29, 2026. It sets no listing date, gives no CFTC product-level status for HPR or BKL, and does not show whether a later announcement exists. The reference data it describes, including hypothetical daily settlement prices, is not trading or production settlement and is not imported.

First production trade

Not confirmed

Not confirmed

Fact checked (UTC day)
Fact verified (UTC day)
No verification date
Effective
Not known

Evidence · BKL regulatory status

Regulatory status

Not confirmed

Current product-level regulatory status was not established in the sources checked. ICE Futures U.S.’s Sep 29, 2026 notice (S20) says listing awaits completion of the CFTC’s request-for-comment period; it gives no product-level CFTC status. Only the first page of the exchange’s rule-filing and notice lists was reviewed (as shown on Oct 5, 2026), so this is not an exhaustive filing search and does not show that no filing or approval exists.

Fact checked (UTC day)
Fact verified (UTC day)
No verification date
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:44 pm EDT, using the saved copy of S17 (retrieved Oct 5, 2026 at 5:30 pm EDT), S18 (retrieved Oct 5, 2026 at 5:30 pm EDT) and S20 (retrieved Oct 5, 2026 at 5:31 pm EDT). No new retrieval. Not repeated for the Oct 8, 2026 edition.

ICE’s current product-level regulatory status and regulatory pathway were not established in the sources checked. ICE’s Sep 29, 2026 notice says HPR and BKL will be listed pending completion of the CFTC’s request-for-comment period and that no listing date or timeline has been set; it gives no product-level CFTC status. The expiry calendar’s first trading date (FTD) is a calendar field and does not confirm a launch or a trade. Only the first page of ICE’s rule-filing and notice lists was reviewed, so the absence of a filing or approval cannot be claimed.

  • S10 ICE and Ornn product-program announcement

    Checked context — does not confirm a value

    Publisher
    ICE
    Source-level locator
    May 19 announcement: benchmark and regulatory caveatFact-specific position not recorded in this snapshot
    Upstream relation
    checked context
    Source checked (UTC day)
    Source document date

    Limitation
    Historical announcement does not establish current product-level regulatory state.

  • S17 ICE Futures U.S. Regulation

    Checked context — does not confirm a value

    Publisher
    ICE Futures U.S.
    Source-level locator
    Regulation introduction; Rulebook and Rule Filings sectionsFact-specific position not recorded in this snapshot
    Upstream relation
    checked context
    Source checked (UTC day)

    Limitation
    Static HTML exposed only the Energy Forms tab. A headless-browser render (2026-10-05 21:30 UTC) showed the first page of Rule Filings (100 titles, Mar 2 – Oct 5, 2026; titles only) and the Rulebook chapter list. No title on that page mentions compute, Ornn, OCPI or GPU, and the chapter list names Chapter 34 “OKX Futures”. Later pages and generic filings were not opened, so this is not an exhaustive filing search.

  • S18 ICE Futures U.S. Notices

    Checked context — does not confirm a value

    Publisher
    ICE Futures U.S.
    Source-level locator
    Exchange Notices sectionFact-specific position not recorded in this snapshot
    Upstream relation
    checked context
    Source checked (UTC day)

    Limitation
    Static HTML lacked the notice list. A headless-browser render (2026-10-05 21:30 UTC) showed page 1 of Exchange Notices (100 rows, Feb 4 – Oct 5, 2026), including one compute notice (S20). Later pages and Member and Disciplinary notices were not reviewed, so the absence of another notice cannot be claimed.

  • S20 ICE Futures U.S. Exchange Notice: compute index reference data (Sep 29, 2026)

    Checked context — does not confirm a value

    Publisher
    ICE Futures U.S.
    Locator
    PDF p. 1, paragraph 2 (listing “pending completion of the request for comment period”)Recorded position where this field was checked. It is not evidence of a value; the field remains unknown.
    Upstream relation
    checked context
    Source checked (UTC day)
    Source document date

    Limitation
    States the exchange’s position as of Sep 29, 2026. It sets no listing date, gives no CFTC product-level status for HPR or BKL, and does not show whether a later announcement exists. The reference data it describes, including hypothetical daily settlement prices, is not trading or production settlement and is not imported.

Regulatory pathway

Not confirmed

Not confirmed

Fact checked (UTC day)
Fact verified (UTC day)
No verification date
Effective
Not known

Regulatory status date

Not confirmed

Not confirmed

Fact checked (UTC day)
Fact verified (UTC day)
No verification date
Effective
Not known

Evidence · BKL listing and launch

Listing status (site classification)

Site classification · verified Oct 5, 2026

Specifications published. A publication classification, not a legal listing conclusion.

Fact checked (UTC day)
Fact verified (UTC day)
Effective
Not known
  • S7 ICE BKL official product page

    Supports this fact

    Publisher
    ICE Futures U.S.
    Source-level locator
    Market Specifications headingsFact-specific position not recorded in this snapshot
    Upstream relation
    supports
    Source checked (UTC day)

    Same reference family as S13 — one family, not independent confirmations.

    Limitation
    Quote denominator differs between quotation and fluctuation sections.

  • S13 ICE BKL generated specification PDF

    Supports this fact

    Publisher
    ICE Futures U.S.
    Source-level locator
    PDF pp. 1–2 field labelsFact-specific position not recorded in this snapshot
    Upstream relation
    supports
    Source checked (UTC day)

    Same reference family as S7 — one family, not independent confirmations.

    Limitation
    PDF displayed date varies by generation (2026-10-04 at the original snapshot check; 2026-10-05 in the 2026-10-05 21:28 UTC retrieval). It is a generation date, not a publication or rule effective date; shares source family with S7.

Exchange listing statement

Verified Oct 5, 2026

ICE’s Sep 29, 2026 notice says the contract will be listed pending completion of the CFTC’s request-for-comment period, and that no listing date or timeline has been set. That is the exchange’s position on the notice date, not a regulatory decision.

Fact checked (UTC day)
Fact verified (UTC day)
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:39 pm EDT, using the saved copy of S20 (retrieved Oct 5, 2026 at 5:31 pm EDT). No new retrieval. Not repeated for the Oct 8, 2026 edition.

ICE’s current product-level regulatory status and regulatory pathway were not established in the sources checked. ICE’s Sep 29, 2026 notice says HPR and BKL will be listed pending completion of the CFTC’s request-for-comment period and that no listing date or timeline has been set; it gives no product-level CFTC status. The expiry calendar’s first trading date (FTD) is a calendar field and does not confirm a launch or a trade. Only the first page of ICE’s rule-filing and notice lists was reviewed, so the absence of a filing or approval cannot be claimed.

  • S20 ICE Futures U.S. Exchange Notice: compute index reference data (Sep 29, 2026)

    Supports this fact

    Publisher
    ICE Futures U.S.
    Locator
    PDF p. 1, paragraph 2 (listing “pending completion of the request for comment period”)
    Upstream relation
    supports
    Source checked (UTC day)
    Source document date

    Limitation
    States the exchange’s position as of Sep 29, 2026. It sets no listing date, gives no CFTC product-level status for HPR or BKL, and does not show whether a later announcement exists. The reference data it describes, including hypothetical daily settlement prices, is not trading or production settlement and is not imported.

Launch date state

Verified Oct 5, 2026

TBD — No listing date set in ICE’s Sep 29, 2026 notice

Fact checked (UTC day)
Fact verified (UTC day)
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:39 pm EDT, using the saved copy of S20 (retrieved Oct 5, 2026 at 5:31 pm EDT). No new retrieval. Not repeated for the Oct 8, 2026 edition.

Current launch date

Verified Oct 5, 2026

TBD — no date is filled in

Fact checked (UTC day)
Fact verified (UTC day)
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:39 pm EDT, using the saved copy of S20 (retrieved Oct 5, 2026 at 5:31 pm EDT). No new retrieval. Not repeated for the Oct 8, 2026 edition.

Calendar FTD (exchange calendar field)

Verified Oct 5, 2026

Oct 5, 2026. This exchange calendar field does not independently confirm production launch or an actual trade.

Fact checked (UTC day)
Fact verified (UTC day)
Effective
Not known

Reference data (exchange statement)

Verified Oct 5, 2026

ICE’s Sep 29, 2026 notice says it makes index reference data, including hypothetical daily settlement prices, available from Oct 5, 2026 for system development. These are not trades, a launch or production settlements, and none of the values are shown on this site.

Fact checked (UTC day)
Fact verified (UTC day)
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:39 pm EDT, using the saved copy of S20 (retrieved Oct 5, 2026 at 5:31 pm EDT). No new retrieval. Not repeated for the Oct 8, 2026 edition.

No production trade has been verified for any of the four contracts in this edition. Announced dates and calendar fields are not treated as trades, and no volume or open interest is shown. ICE says reference data including hypothetical daily settlement prices is available from Oct 5, 2026 for system development; those values are not trades or production settlements and are not shown. This is an evidence assessment, not a statement that no trading occurred.

No market-data display licence is recorded for this site, so price, settlement, volume, open-interest and index-history components are off. This does not mean the market has no data.

Evidence · BKL trading evidence

Trading evidence (site assessment)

Site classification · verified Oct 5, 2026

Not confirmed. This describes the evidence assessment; it does not claim that no trading occurred.

Fact checked (UTC day)
Fact verified (UTC day)
Effective
Not known
This edition
Reviewed for the Oct 6, 2026 edition on Oct 5, 2026 at 11:39 pm EDT, using the saved copy of S20 (retrieved Oct 5, 2026 at 5:31 pm EDT). No new retrieval. Not repeated for the Oct 8, 2026 edition.

ICE’s current product-level regulatory status and regulatory pathway were not established in the sources checked. ICE’s Sep 29, 2026 notice says HPR and BKL will be listed pending completion of the CFTC’s request-for-comment period and that no listing date or timeline has been set; it gives no product-level CFTC status. The expiry calendar’s first trading date (FTD) is a calendar field and does not confirm a launch or a trade. Only the first page of ICE’s rule-filing and notice lists was reviewed, so the absence of a filing or approval cannot be claimed.

No production trade has been verified for any of the four contracts in this edition. Announced dates and calendar fields are not treated as trades, and no volume or open interest is shown. ICE says reference data including hypothetical daily settlement prices is available from Oct 5, 2026 for system development; those values are not trades or production settlements and are not shown. This is an evidence assessment, not a statement that no trading occurred.

  • S7 ICE BKL official product page

    Supports this fact

    Publisher
    ICE Futures U.S.
    Source-level locator
    Market Specifications headingsFact-specific position not recorded in this snapshot
    Upstream relation
    supports
    Source checked (UTC day)

    Same reference family as S13 — one family, not independent confirmations.

    Limitation
    Quote denominator differs between quotation and fluctuation sections.

  • S15 ICE BKL expiry calendar

    Supports this fact

    Publisher
    ICE Futures U.S.
    Source-level locator
    Expiry Details table, Nov26–Dec27 rowsFact-specific position not recorded in this snapshot
    Upstream relation
    supports
    Source checked (UTC day)

    Limitation
    Same calendar/actual-execution distinction as S14.

  • S20 ICE Futures U.S. Exchange Notice: compute index reference data (Sep 29, 2026)

    Checked context — does not confirm a value

    Publisher
    ICE Futures U.S.
    Locator
    PDF p. 1, paragraphs 2–3 (no listing date set; reference data with hypothetical settlement prices)Recorded position where this field was checked. It is not evidence of a value; the field remains unknown.
    Upstream relation
    checked context
    Source checked (UTC day)
    Source document date

    Limitation
    States the exchange’s position as of Sep 29, 2026. It sets no listing date, gives no CFTC product-level status for HPR or BKL, and does not show whether a later announcement exists. The reference data it describes, including hypothetical daily settlement prices, is not trading or production settlement and is not imported.

First production trade

Not confirmed

Not confirmed

Fact checked (UTC day)
Fact verified (UTC day)
No verification date
Effective
Not known